Inside PazflorBelgian firm VRcontext International was recently contracted by Total E&P Angola to deliver a 3D immersive training simulator (ITS) for the Pazflor FPSO, to be anchored on one of Total’s largest offshore producing assets.The company’s…
Houston-based managed pressure drilling systems specialist Managed Pressure Operations International reports that it is expanding its delivery of the innovative Non-Stop Driller (NSD) continuous circulation system.Devoloped to maintain…
GE Oil & Gas introduced its next-generation technology for shearing and sealing wellbore tubulars at OTC 2012. The new Blind Shear Ram, designed for use in GE’s 183/4in ram BOPs, is claimed capable of both shearing and sealing after cutting 65/8in tool joints…
Nearly 11 years after Weatherford first commercially deployed drilling-with-casing, the service company is still testing the limits of where and how the technology can be helpful when it comes to overcoming wellbore instability. Jennifer Pallanich catches…
A federal investigation of the Macondo disaster does not pinpoint what caused the well's cement job to fail, but backs up earlier conclusions that operator BP and its contractors skirted safety measures that could have prevented the blowout…
A federal investigation into the 2010 Macondo disaster does not pinpoint what caused the well's cement job to fail, but backs up earlier conclusions that operator BP and its contractors skirted safety measures that could have prevented the blowout…
An internal Transocean investigation into the explosion and loss of the Deepwater Horizon found that the tragedy was the result of ‘compromised' well integrity due to a series of well design, construction and temporary abandonment decisions made by operator BP…
The Deepwater Horizon's blowout preventer was a victim of the Macondo disaster, not the perpetrator. So says consultant Ian Fitzsimmons in his latest think piece for OE which takes issue with some of the findings of DNV's forensic study of the…
The 5 million barrels of oil that spilled into the Gulf of Mexico last year from the BP-operated deepwater Macondo well after a bad shear job played heavily on Radoil president Benton Baugh's mind. An inventor at heart, he knew there had to be a way to shear the unshearable…
With wellbores drilled in ever deeper waters penetrating further into the earth and clients demanding improved performance from all parts of the drilling process, VAM Drilling has focused on two aspects of the drillstem it believes deliver on the reliability front…
Never one to pull his punches, consultant Ian Fitzsimmons applauds the openness of January's National Commission report to President Obama on the Macondo well disaster, but reprimands the UK Health & Safety Executive over its handling of the…
The US lifted the six-month moratorium on deepwater exploration in October, while codifying new rules governing drilling safety and well control. Russell McCulley looks at what the new regulations could mean for oil & gas companies doing business in the Gulf of Mexico…
Heavy lifting, drilling and pipelay solutions provider Huisman has designed and built rock dumping systems before, notably for Tideway's Rollingstone and Seahorse vessels. But its next system, to be delivered later this year for the Tideway newbuild Flintstone…
Macondo mattersSir, OE's article by Ian Fitzsimmons on preventing future Macondo spills [‘Macondo and other titanic struggles', OE July] was excellent and I distributed a copy to my colleagues both in EIA and DOE. The recommendations made…
Eleven proposals will receive a cut of $10 million in funding from the Research Partnership to Secure Energy for America (RPSEA) under its ultradeepwater program. The proposed technologies are aimed at improving safety, minimizing environmental impact…