Drill Pipe News

 

Using wired drill pipe to drive down well cost

Aug 01, 2016

Wired drill pipe has been a long time coming. As operators look at cost savings across the full life cycle, the benefits are now being recognized, says NOV’s Leon Hennessy. Drill floor operations…

Franks runs first string weight reduction system

Jun 22, 2016

Frank's International deployed its patented 1250-tonne Buoyancy Module (BM) Spider along with ExPert Landing String Solutions’ (ExPert) Drill Pipe Buoyancy Modules to help Anadarko achieve a nearly 250,000-pound reduction in total weight…

A new way to P&A

Jun 21, 2016

In advance of the Deepwater Intervention Forum this 9-11 August 2016, Jerry Lee reports on a new approach to riserless plug and abandonment carried out by Wild Well Control in the US Gulf of Mexico. PA Tool component description and diagram…

Coretrax CX saves costs

Jun 01, 2016

Coretrax, leading engineered servicing company for wellbore clean and abandonment, has secured cost savings of nearly £10 million in rig time for UK operators.   Focused on improving operational efficiencies and saving rig time in wellbore clean up and abandonment operations…

Byron to deepen SM71-1

Apr 27, 2016

Byron Energy will further its efforts at the SM71-1 well in the Gulf of Mexico after encountering the presence of oil in three intervals, according to partner Otto Energy. A quad combo porosity logging run has been acquired and 7 5/8in…

Byron hits at GoM SM 71 well

Apr 20, 2016

Byron Energy has encountered three discrete hydrocarbon bearing intervals at its latest exploration development in the South Marsh Island block in the Gulf of Mexico. Hercules 205 jackup, from Hercules…

Byron abandons GoM well, moves to next

Mar 30, 2016

Byron Energy’s attempt to drill a sidetrack well to SM 6#2 after a drill pipe became stuck has turned out to be unsuccessful in the Gulf of Mexico, with the company abandoning the well and moving on to another. The Hercules 205…

Interwell's rigless P&A concept

Mar 29, 2016

In this video, Interwell shows an illustration of its new approach of its plugging and abandonment (P&A) solution that is a completely rigless approach to well P&A – with no need to remove tubing prior to P&A operations, and no need for drill pipe while placing primary/secondary barriers…

READ launches ZeroTime at ICoTA

Mar 22, 2016

Aberdeen-based well intervention specialist READ Cased Hole launched its latest logging technology, ZeroTime, at the 2016 SPE ICoTA Coiled Tubing and Well Intervention Conference and Exhibition in Houston. As a logging while working solution…

Byron drills GoM appraisal following stuck pipe drill

Mar 21, 2016

Byron Energy has started drilling a sidetrack well to the SM 6#2 well in the Gulf of Mexico, after a drill pipe became stuck with several unsuccessful attempts over a three-day period to free it, according to partner Otto Energy. Map…

Transocean delays five newbuilds to 2020

Mar 08, 2016

Global offshore drilling giant Transocean has set back the delivery date for five new jackup rigs by nearly four years.  In an agreement with rig builder Keppel Offshore & Marine's shipyard, Keppel FELS, delivery of the five Super B 400…

Breaking ground on Butch

Feb 01, 2016

Open water coiled tubing drilling has been used offshore Norway in an industry first. Elaine Maslin found out more. Island Offshore’s Island Constructor. Images from Centrica Norge Coiled tubing drilling (CTD) isn’t a new concept…

BOP Technologies launches fail-safe design

Dec 10, 2015

Houston-based BOP Technologies announced a new approach to allow a BOP to work even if the drilling rig loses power or hydraulic pressure. The company calls it 'a huge step' toward making BOPs the last line of defense in case of a blowout…

BSEE: Crew to blame for 2013 blowout

Sep 14, 2015

A new report from the US Bureau of Safety and Environmental Enforcement (BSEE) blamed the crew working Walter Oil & Gas’ South Timbalier Block 220 Well A-3, 55mi off Louisiana, for a well control incident that caused a blowout and fire onboard…

Peak’s Straddle System

Aug 26, 2015

In this video, Peak Well Systems shows its SIM and SIMPLUS Systems that can be fitted with straddle tubes between an upper and lower packer to provide isolation across the straddled zone. The SIM System enables operators to deploy flow control devices…

Current News

UK Firm Seeks Suppliers to Build Full-Scale Tidal Energy Prototype

UK Firm Seeks Suppliers to Bui

Brava Energia Inks $65M Deal with PetroReconcavo for Natural Gas Assets

Brava Energia Inks $65M Deal w

Record Offshore Wind Auction Required for UK to Meet Targets

Record Offshore Wind Auction R

First French Floating Wind Farm Fully Commissioned

First French Floating Wind Far

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine