Drilling Mud News

 

Coiled tubing use extends offshore productivity

May 20, 2013

New uses for present technology with new equipment to further effectiveness The Coiled Tubing and Well Intervention Conference, sponsored by ICoTA, the Intervention and Coiled Tubing Association, was held in late March in The Woodlands Conference Center north of Houston…

Decommissioning—a view from the Southern North Sea conference

May 20, 2013

Innovating and being willing to do things differently could help save in excess of £100million of the cost of decommissioning its southern North Sea assets, says Anglo-French independent Perenco. But there is still plenty of scope for improvement…

Thermal treatment process

Mar 25, 2013

UK-based integrated drilling and environmental solution provider TWMA offers thermal processing technologies designed to treat oil mud contaminated by drilling wastes at the source. The thermal treatment process uses a cylindrical mill to convert mechanical energy into thermal energy…

A 'wells-up approach' to rig design

Oct 07, 2012

Getting the drilling facilities design process right not only ensures the operator gets the ideal rig for the job but also increases HSE and operational efficiencies and cuts rig construction and commissioning costs. Andy Kay and Rodrigo Rendon discuss the RDS approach…

Enteq Upstream

Aug 17, 2012

Enteq Upstream has acquired KM Services and Pro-Flow Fabrication Technologies and will rebrand them Enteq KMS. The two companies, both based in Houston, supply machined and fabricated parts and products for directional drilling, mud motor and measurementwhile-drilling equipment…

Drilling automation deal

Jun 26, 2012

Cameron typically shows off serious subsea technology during the annual Houston event but this year chose instead to put the spotlight on its purchase of the TTS Energy Division from Norway’s TTS Group, a transaction expected to close soon.The…

Total plugs Elgin leak

May 18, 2012

The well intervention operation undertaken by Total and Wild Well Control has succeeded in stopping a gas leak at Elgin’s G4 well, the French supermajor announced on 16 May 2012. Total’s president of E&P Yves-Louis Darricarrère called the outcome a ‘major turning point…

Liner technology comes of age

Apr 01, 2012

Nearly 11 years after Weatherford first commercially deployed drilling-with-casing, the service company is still testing the limits of where and how the technology can be helpful when it comes to overcoming wellbore instability. Jennifer Pallanich catches…

Macondo report draws mixed response

Oct 01, 2011

A federal investigation of the Macondo disaster does not pinpoint what caused the well's cement job to fail, but backs up earlier conclusions that operator BP and its contractors skirted safety measures that could have prevented the blowout…

Macondo report slams BP, contractors

Sep 01, 2011

A federal investigation into the 2010 Macondo disaster does not pinpoint what caused the well's cement job to fail, but backs up earlier conclusions that operator BP and its contractors skirted safety measures that could have prevented the blowout…

Transocean's Macondo report pins blame on BP

Jul 07, 2011

An internal Transocean investigation into the explosion and loss of the Deepwater Horizon found that the tragedy was the result of ‘compromised' well integrity due to a series of well design, construction and temporary abandonment decisions made by operator BP…

Macondo and the Presidential Commission

Mar 02, 2011

Never one to pull his punches, consultant Ian Fitzsimmons applauds the openness of January's National Commission report to President Obama on the Macondo well disaster, but reprimands the UK Health & Safety Executive over its handling of the…

Macondo the unfolding aftermath

Nov 01, 2010

In his think piece for OE’s July issue, consultant Ian Fitzsimmons drew parallels between the Deepwater Horizon tragedy and the earlier Titanic, Ixtoc-1, Piper Alpha, Comet and Challenger disasters in terms of their presumed design infallibility…

Handling the low-gravity solids overload

Sep 01, 2010

Conventional solids control methods are inadequate to manage low-gravity solids smaller than 8-10 microns. M-I Swaco’s Rich Cook discusses a new solution, recently successfully employed in West Africa, that helps manage these solids while keeping excess rig space to a minimum…

Rechargeables to expand MWD horizons

Apr 05, 2010

The importance of battery selection for demanding downhole electronics applications, in particular measurement-while-drilling tools, is discussed by Saft’s Wayne Pitt.As oil companies strive to reap the maximum potential from their prospects…

Current News

ESAB Fast-Tracks Welding Efficiency, Effectiveness

ESAB Fast-Tracks Welding Effic

Seequent Receives Award at Global Offshore Wind 2025, Hosts Upcoming Webinar

Seequent Receives Award at Glo

Libya Blocks Greek Tender for Hydrocarbon Exploration Off Crete

Libya Blocks Greek Tender for

Russia Looks to Myanmar Offshore Oil and Gas Prospects

Russia Looks to Myanmar Offsho

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine