Riser News

 

Pulse uses INTEGRI sensors in Gulf of Mexico

Nov 04, 2014

Pulse designed, manufactured and installed a powerful motion and strain monitoring system to verify the design of the first lazy-wave steel riser system to be installed in the Gulf of Mexico. The monitoring program at Anadarko’s Constitution…

BMT riser monitoring for Total's Egina

Oct 31, 2014

BMT Scientific Marine Services (BMT), a subsidiary of BMT Group, has been selected by Saipem to supply the riser integrity monitoring systems for Total's Egina development located 150km off the coast of Nigeria.  The Egina field, discovered in 2003…

BMT gets Saipem contract off Brazil

Oct 15, 2014

Saipem awarded BMT Group Ltd. a contract to supply the riser integrity monitoring systems for the Lula Norte and Lula Extremo Sul developments in the Santos Basin pre-salt region, off Brazil. BMT’s subsidiary, BMT Scientific Marine Services…

New technologies for changing environments and reservoirs

Sep 01, 2014

SBM Offshore discusses some of the company’s developing technologies and how it is working toward unlocking reserves in the Gulf of Mexico. Exploration for fields further offshore and in deeper waters is leading to the development of more complex reservoirs…

ONS: Aquaterra launches riser tool

Aug 26, 2014

UK-based engineering firm Aquaterra Energy has launched a Riser Monitoring System (RMS) it believes will revolutionize integrity management and bring improved reliability and accuracy of data acquisition to the offshore oil and gas industry…

2H secures Kaombo contract

Aug 13, 2014

Heerema Marine Contractors chose 2H Offshore to engineer hybrid risers for Total’s Kaombo Block 32 project offshore Luanda, Angola in 1400-1900m water depth. 2H Offshore's scope of work includes performing part of the detailed engineering…

Combating fatigue

Aug 01, 2014

Fig. 1: Illustration of riser acceleration vs. wave height. Images from 2H Offshore.  Michael Long Ge and Himanshu…

GE wins 20,000psi BOP order

Jun 25, 2014

Maersk Drilling has ordered the offshore oil and gas industry’s first 20,000-psi (20-ksi) rated deepwater blowout preventer (BOP) stack and riser systems. The four BOPs and two risers, ordered from GE Oil and Gas, will be used in the Project 20K agreement with BP…

Making connections

Jun 12, 2014

Alpha Mahatvaraj of GMC Inc. discusses how their new mechanically connected risers could offer a potential solution for ultra-deepwater projects. The contribution of ultra-deepwater developments to world oil production is expected to…

Managed-pressure drilling riser stack integration

Jun 09, 2014

As the deepwater prospects being drilled today address ever more complex conditions, the drilling industry needs to adjust its technology to address the challenges that arise. The use of conventional “open to atmosphere” drilling methods…

Claxton bags its biggest contract

Jun 03, 2014

UK-based Acteon group company Claxton has been awarded its largest single riser contract in its history by Norway's Det norske oljeselskap. The multi-year contract is from January 2014 thru June 2020, and includes high- and low-pressure risers…

OneSubsea selects Airborne risers

Apr 17, 2014

Netherlands-based Airborne Oil & Gas has secured an order for multiple flexible risers and jumpers from OneSubsea. Applying the Thermoplastic Composite Pipe (TCP) concept, the flexible risers and jumpers will be used for acid stimulation…

Trelleborg bags large DRBM deal

Mar 27, 2014

Trelleborg’s offshore operation has been awarded one of its largest single orders for drill riser buoyancy modules (DRBM) by Daewoo Shipbuilding & Marine Engineering (DSME) in Korea. Consisting of RiserGuard and riser buoyancy, the contract…

Visualizing operations in Technip’s model lab

Nov 01, 2013

Physical modeling of deepwater projects can be a very useful tool. Despite the advent of computer modeling and immersive computer visualization environments, physical 3D models help vessel operators, riggers, and field engineers find potential problem areas and resolve spatial issues…

2H Offshore contract for TEN

Sep 30, 2013

2H Offshore, an Acteon company, has been appointed by Tullow Oil as lead riser engineering consultancy for the delivery of the flexible riser system for its Tweneboa, Enyenra and Ntomme (TEN) field development, offshore Ghana. The TEN development is located in the deepwater Tano block…

Current News

OEG Nets Multi-Year Contract with Oil Major

OEG Nets Multi-Year Contract w

TotalEnergies Sells Bonga Field Stake to Shell for $510M

TotalEnergies Sells Bonga Fiel

Valeura Concludes Eight-Well Drilling Campaign in Gulf of Thailand

Valeura Concludes Eight-Well D

McDermott Reduces Carbon Intensity

McDermott Reduces Carbon Inten

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine