Offshore FPSO News - page 79

 

Legeneering inks Woodside FPSO work

Jun 21, 2017

Legeneering Australia was awarded a key, long-term offshore maintenance services contract for Woodside-operated floating production storage and offloading facilities (FPSO). The contract is for an initial period of five years with a further two extension options of one year each…

Ocean Installer to SURF Al Jurf

Jun 20, 2017

Mabruk Oil Operations has awarded Ocean Installer a subsea umbilical, risers and flowlines (SURF) project at the Al Jurf oil field in the Mediterranean. Mabruk Oil Operations is a joint venture (JV) between Total E&P and the National Oil Cooperation (NOC) of Libya…

Updated: Exxon, Hess move forward with Liza

Jun 16, 2017

ExxonMobil and partner Hess have made a final investment decision to proceed with a US$4.4 billion first phase of development of the giant Liza field, in the Stabroek block, offshore Guyana. The firm says it has also had positive results on its latest well on the field…

Statoil inks Garantiana tieback study

Jun 12, 2017

Wood Group has been awarded two new contracts by Statoil to deliver concept and feasibility studies to their Norwegian North Sea assets. Wood Group will deliver a topside concept study evaluating the tie in of Total’s Garantiana field development to Statoil’s Gullfaks B and Visund facilities…

Jubilee FPSO featured on Ghana's currency

Jun 01, 2017

Most floating production, storage and offloading (FPSO) vessels are known for making money (or costing a lot of it), but the government of Ghana has decided to turn one into money, literally. EPCI contractor MODEC announced that the Kwame Nkrumah MV21 FPSO…

Husky firms up West White Rose

May 30, 2017

Husky Energy has firmed up plans for its West White Rose Project offshore Newfoundland and Labrador with first oil set for 2022, while announcing a new discovery at Northwest White Rose.   The SeaRose FPSO…

Octanex to drill at Ophir

May 25, 2017

The NAGA 2 self-elevating mobile offshore drilling unit is set for mobilization to the Ophir oil field offshore Malaysia, according to Octanex. Map of the Ophir field, from Octanex. The…

Kraken set for June first oil

May 25, 2017

EnQuest's US$2.6 billion Kraken heavy oil field development is on track for first oil before the end of June, according to the North Sea independent.  The Kraken development, about 125km east of the Shetland Islands, off Scotland, will…

Eni starts OCTP production early

May 22, 2017

Eni has started first production from its Offshore Cape Three Points (OCTP) project, offshore Ghana. The project, which comprises the Sankofa Main, Sankofa East and Gye-Nyame fields, about 60km off Ghana, was completed in just two and a half years…

First Libra FPSO arrives in Brazil

May 22, 2017

Teekay has announced that the floating production, storage and offloading (FPSO) vessel Pioneiro de Libra arrived in Brazilian waters on 17 May. The FPSO unit set sail on 28 March from the Jurong shipyard in Singapore, where the conversion of the unit has been taking place since 2014…

BP's Glen Lyon comes onstream

May 22, 2017

BP has launched a 'return to growth' for its North Sea business after marking first oil from the Quad 204 project, west of Shetland on the UK Continental Shelf.   Quad 204 is redevelopment of the 1 billion barrel plus Schiehallion and Loyal fields…

Petrobras flows at Lula Sul

May 18, 2017

Petróleo Brasileiro (Petrobras) started production from the Lula Sul field offshore Brazil with the P-66 floating production and storage offloading (FPSO) unit. Image from Petrobras Twitter. Lula…

Premier's Catcher on track

May 15, 2017

Premier Oil says it will begin a short subsea tie-in campaign next month at the Varadero prospect, as its Catcher project remains on track to deliver first oil later this year. Image from Premier Oil Premier…

Centrica invests in Chestnut field

May 15, 2017

Centrica is investing £35 million in the North Sea Chestnut field, drilling a new production well which aims to more than treble production. The well is expected to also extend the life of the field, which otherwise would have been shut in later this year…

500 MMbbl plus recoverable confirmed in Lancaster

May 08, 2017

A new evaluation on Hurricane Energy's Lancaster field, west of Shetland, has said the field contains 2.3 billion bbl in place, a 120% increase compared to the 2013 estimate, and attributed 2P reserves to the field for the first time. According to the Competent Persons Review (CPR)…

Current News

Coastal Virginia Offshore Wind Project Has Not Been Delayed

Coastal Virginia Offshore Wind

Oceaneering Signs On for Terradepth's Ocean Data Service

Oceaneering Signs On for Terra

US Oil and Gas Production Rebounds

US Oil and Gas Production Rebo

Macquarie Asset Management to Sell Stake in UK Offshore Wind Farm

Macquarie Asset Management to

Subscribe for OE Digital E‑News

Offshore Engineer Magazine