E Plug News

 

Statoil plugging Gullfaks Sør with Songa Dee

Nov 03, 2014

Statoil received consent to use the Songa Dee mobile drilling facility to permanently plug exploration well 34/10-52 A/B, according to the Petroleum Safety Authority Norway. Well 34/10-52 A/B is located at the Statoil-operated Gullfaks Sør…

Forties pipeline installed

Oct 31, 2014

Apache North Sea Ltd. awarded STATS Group a contract to safely isolate the Forties Pipeline System (FPS) in the North Sea. The contract is for subsea isolation valves (SSIV) and piping spools to be safely installed and leak tested. This…

A stabilizing influence

Oct 03, 2014

When the Varg A monotower offshore Norway required stabilization, IK came up with a novel, remote, subsea solution. Elaine Maslin found out more after hearing about the project at the Underwater Technology Conference in Bergen earlier this year…

Peak introduces new plugs

Aug 29, 2014

Specialist downhole tool provider, Peak Well Systems has expanded its product portfolio with the launch of its new SIMPLUS range of V3-Grade plugs certified to ISO14310. The portfolio employs an ISO-14310 Grade V3-rated SIMPLUS Retrievable…

Peak Well Systems opens Aberdeen tech center

May 28, 2014

Specialist downhole tool provider Peak Well Systems has relocated its European regional headquarters to a newly constructed, office and workshop facility in Aberdeen which will meet the needs of its expanding North Sea business.  Peak’s investment…

Interwell wins ICoTA

Jan 16, 2014

European Chapter Innovation Award (EJCA). The EJCA enables clients to deploy bridge plugs and retrieve bridge plugs in a single trip. The EJCA has saved two wireline runs per intervention and has ensured the plugs can be equalized even in high debris well environments.

Tullow's Mantra water wet

Jan 03, 2014

Tullow Oil plc's Mantra well, offshore Norway, is to be plugged and abandoned after being classified as water wet. Mantra, drilled with the 31/3-4 wildcat exploration well,was the first exploration well in the Tullow-operated 551 production license…

Deepwater well decommissioning

Nov 01, 2013

Houston-based Helix ESG recently completed a deepwater well decommissioning project in 7919ft. Darin Hilton explains the steps and options involved in plugging and abandonment. Over the past several years, there has been a growing demand…

Salamander plugs Thai prospect

Sep 30, 2013

Salamander Energy plugged and abandoned its offshore Ayutthaya exploration well prospect in Block G4/50 in the Gulf of Thailand as a dry hole.  Ayutthaya is located less than 1 mi. northeast of the recent Surin oil discovery. The well was spud earlier this month…

ATCE13: Archer launches gas-tight storm plug

Sep 30, 2013

Oilfield service provider, Archer, has released STORMLOCK—an ISO 14310 V0-rated, gas-tight storm plug specifically designed for suspension operations in the Gulf of Mexico and other deepwater markets. STORMLOCK is being launched at Archer's…

Dry well on Storbarden

Apr 29, 2013

Bergen-based explorer Rocksource said this morning that its exploration well on the Storbarden prospect will be plugged and abandoned after finding no hydrocarbons.  The well was drilling on PL 506S in the Norwegian sector of the North Sea using the Borgland Dolphin drilling rig…

Archer secures Heimdel contract

Feb 12, 2013

Archer to provide P&A services for Statoil Image: ArcherArcher Ltd., a global oilfield service provider headquartered in Bermuda, has secured a contract with Statoil for the permanent plugging and abandonment of 12 gas wells on the…

AX-S final commissioning

Jul 19, 2012

Final commissioning of Expro’s ground-breaking AX-S well intervention system took place recently onboard the Havila Phoenix on a subsea well in Norway’s Onarheimsfjorden. Preparations are now under way for the system’s first commercial well intervention job in the North Sea…

‘Tell-tale’ technology seals Sinbad success

May 01, 2012

With the successful deployment of its new large bore SIM plug systems at Apache’s Sinbad field on the North West Shelf, Peak Well Systems chalked up an industry first offshore Australia earlier this year. Russell McCulley pays a visit to the…

Remediating plugged subsea flowlines

Feb 16, 2010

Remediating plugged subsea lines in deep and ultra-deepwater is dangerous and time-consuming and can become extremely costly if coiled tubing or wireline intervention is required to resolve the problem. Champion Technologies’ Jeremy Lee describes…

Current News

Halliburton Launches EarthStar 3DX Horizontal Look-Ahead Resistivity Service

Halliburton Launches EarthStar

ConocoPhillips Hires Subsea7 for FEED Work Offshore Norway

ConocoPhillips Hires Subsea7 f

Aramco, ADES Ink 10-Year Contract Renewal for Previously Suspended Jack-Up Rig

Aramco, ADES Ink 10-Year Contr

Cellula Robotics Expands AUV Market Reach in Northern Europe

Cellula Robotics Expands AUV M

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine