Offshore Floating Production News - page 104

 

BW closer to recovering FPSO damaged in fire

Feb 08, 2016

BW Offshore is a step closer to recovering the Cidade de São Mateus floating production vessel to shore for repairs more than a year after it was damaged in a fire.  The fire, on 11 February 2015, offshore Brazil, saw nine of the 74 crew die and 26 require medical attention…

HHI, DHIC, CCEI sign equipment localization MOU

Feb 04, 2016

To collaborate on the localization of main equipment and materials for offshore plants, Hyundai Heavy Industries (HHI) has signed a memorandum of understanding with Doosan Heavy Industries and Construction (DHIC) and Center for Creative Economy and Innovation (CCEI) in Ulsan and Gyeongnam…

Panoro Energy FPSO embarks for Aje field

Feb 04, 2016

Panoro Energy announced that the final works on the floating production, storage and offloading (FPSO) vessel, for the Aje field operations, have been completed. The vessel has left Singapore and is expected to arrive in Nigeria mid-March 2016…

Ichthys LNG one step closer

Feb 01, 2016

Audrey Raj speaks to Japanese gas giant INPEX about its US$34 billion Ichthys LNG development and the key components that make up the offshore production facilities of the project. The monoethylene…

GE Oil & Gas, SBM ink FPSO agreement

Feb 01, 2016

GE Oil & Gas and SBM Offshore have agreed to what they are calling the first ever global maintenance agreement for an entire fleet of floating production, storage and offloading (FPSO) vessels. Under the agreement, GE Oil & Gas will provide spare parts…

Video: TEN FPSO sailaway

Feb 01, 2016

The floating production, storage and offloading (FPSO) vessel, Prof. John Evans Atta Mills set sail from Singapore on 23 January.  The vessel is sailing to Ghana, where it will produce and store oil from Ghana’s Tweneboa-Enyenra-Ntomme (TEN) offshore oil fields…

Every barrel (now) matters

Feb 01, 2016

A relentless focus is required to maintain and optimize production on often aging North Sea assets. Elaine Maslin reports. Wintershall’s Brage platform. Photos from Wintershall.  Optimizing…

Wintershall to cut Skarfjell costs 40%

Jan 27, 2016

German operator Wintershall has delayed a decision on concept selection for its Skarfjell project offshore Norway in order to slash 40% of the costs from the project. Wintershall said this will see a decision made in Q3-Q4 this year, rather than Q1 as expected…

Aker picked for Johan Castberg FPSO study

Jan 26, 2016

Statoil has picked Aker Solutions to provide a concept study for a floating production, storage and offloading facility for the Johan Castberg oil field development in the Barents Sea. The announcement comes just days after Statoil said it was now moving ahead with the delayed project…

SBM Offshore agrees settlement - but not guilt

Jan 25, 2016

Floating production specialist SBM Offshore has accepted an out of court settlement over allegations relating to the Petrobras corruption scandal - but says this doesn't amount to an admission of guilt.  The allegations were made in December…

BW Athena to demobilize, seeks work

Jan 22, 2016

The BW Athena floating production, storage and offloading (FPSO) vessel is to be demobilized from the Athena field in the UK North Sea next month. The move, which had been expected, will the see BW Athena leave the field Athena and Anglia fields…

Lundin sells Bertam FPSO

Jan 22, 2016

Swedish exploration and production firm Lundin Petroleum is to sell the floating production vessel Bertam to Malaysian state-backed M3nergy for US$265 million. The deal, expected to complete in Q1, is subject to certain completion conditions…

Goliat first oil creeps closer

Jan 21, 2016

Eni is a step closer to starting production on the Barents Sea Goliat field in coming weeks following consent to use the Goliat floating production, storage and offloading (FPSO) facility from Norway's Petroleum Safety Authority (PSA). The…

Trelleborg opens seal inspection facility

Jan 20, 2016

Trelleborg Sealing Solutions has opened a dedicated climate-controlled swivel stack seal inspection facility for the validation of custom seals for floating production storage and offloading (FPSO) operators. The facility, located in Barendrecht…

Johan Castberg costs halved

Jan 20, 2016

Statoil is to move ahead with its delayed Johan Castberg oil field in the Barents Sea after cutting estimated development costs by half. The firm is now planning a floating production, storage and offloading vessel for the development…

Current News

ABL Gets Neptun Deep Job for OMV Petrom in Black Sea

ABL Gets Neptun Deep Job for O

Petrobras and China’s CNCEC to Collaborate on Oil and Gas, Renewables

Petrobras and China’s CNCEC to

Norway Clears TGS and PGS Merger

Norway Clears TGS and PGS Merg

Full Capacity Operations at Tyra II Gas Development Up for Potential Delays

Full Capacity Operations at Ty

Subscribe for OE Digital E‑News

Offshore Engineer Magazine