TDW’s Clamp Installation Tool

Published

T.D. Williamson Offshore Services (TDW) introduced the Clamp Installation Tool (CIT), a lightweight, remote-controlled system that installs any proprietary clamps or fittings on subsea pipelines in need of repair or to prepare for tie-ins to new pipelines. The CIT can be controlled onboard a platform or a diving support vessel (DSV), enhancing operational safety is enhanced, and improving control over clamp installation. It provides direct control of clamp installation operations during deepwater pipeline repair and tie-ins. www.tdwilliamson.com

Current News

Dajin Forms Offshore Wind Alliance with German Port Terminal Operator

Dajin Forms Offshore Wind Alli

EnerMech Hires Former SLB Executive to Lead Energy Solutions Division

EnerMech Hires Former SLB Exec

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

Eni Expands Asian Footprint wi

Jasmund Substation’s Topside and Jacket Sets Sail to Baltic Sea

Jasmund Substation’s Topside a

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine