TDW’s Clamp Installation Tool

T.D. Williamson Offshore Services (TDW) introduced the Clamp Installation Tool (CIT), a lightweight, remote-controlled system that installs any proprietary clamps or fittings on subsea pipelines in need of repair or to prepare for tie-ins to new pipelines. The CIT can be controlled onboard a platform or a diving support vessel (DSV), enhancing operational safety is enhanced, and improving control over clamp installation. It provides direct control of clamp installation operations during deepwater pipeline repair and tie-ins. www.tdwilliamson.com

Current News

Iberdrola Picks Up $4.9B to Finance 1.4GW UK Offshore Wind Farm

Iberdrola Picks Up $4.9B to Fi

Perenco Brings Woodside’s Trinidad Oil and Gas Assets Into Its Fold

Perenco Brings Woodside’s Trin

Vallourec Brings CNOOC, Petrochina as New Clients in Iraq

Vallourec Brings CNOOC, Petroc

Germany’s SEFE Inks Three-Year LNG Supply Deal with ADNOC

Germany’s SEFE Inks Three-Year

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine