Total selects Aker for Kaombo

Total has selected Aker Solutions to provide a subsea production system for the Kaombo Block 32 development in Angola.

The NOK14 billion contract will see Aker Solutions deliver 20 subsea manifolds and 65 vertical subsea wellsets. The order also includes associated controls and work-over and tie-in systems. The first deliveries are scheduled for the second quarter of 2015.

Kaombo is in block 32, in 1400-1900m water depth, about 150km off Angola. The  project will develop six fields (Gengibre, Gindungo, Caril, Canela, Mostarda and Louro) in the central and southeast part of the block.

The development will comprise 59 subsea wells, connected to two floating production vessels. It will make use of "hybrid loop" technology for multiphase pumping and transport of fluids.

Read more: - US$16 billion Kaomba projects gets go-ahead - http://www.oedigital.com/component/k2/item/5422-16bn-kaombo-project-go-ahead

Aker Solutions has a joint venture with Prodiaman Oil Services, an Angolan company that will execute local content activities related to this and other future Aker Solutions subsea projects in Angola.

 

Current News

Chevron Oil Platform Fire Offshore Angola Injures 17

Chevron Oil Platform Fire Offs

Russian Arctic LNG 2 Starts Second Production Train

Russian Arctic LNG 2 Starts Se

SLB Unveils Novel Imaging Tool to Optimize Drilling Efficiency

SLB Unveils Novel Imaging Tool

Ithaca Energy Bolsters Stake in North Sea Gas Field

Ithaca Energy Bolsters Stake i

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine