Technip gets Anadarko GoM subsea contract

Published

Anadarko Petroleum Corp. awarded Technip a contract for the K2 Riser Base Gas Lift project, located in Green Canyon 608 in the Gulf of Mexico, at a water depth of approximately 1300m.

Upon the terms of agreement, Technip will provide:

  • Project management and engineering from Technip’s Houston office,
  • Design, fabrication, and installation of two PLEMs and four PLETs,
  • Installation of flowline, jumpers and associated terminations and hardware,
  • Installation of one free issued dynamic umbilical with SUTA(1) and flying leads,
  • Pre-commissioning of the flowline and umbilical gas lift system.

The offshore installation is expected to be done in 2H 2015 by Technip’s ultra deepwater pipelay and subsea construction vessel Deep Blue.

Image of the Deep Blue. From Technip.

Current News

Turkey Launches Deep Sea Drilling Mission in Somalia

Turkey Launches Deep Sea Drill

OMV Nominates BP Executive Emma Delaney as Next CEO

OMV Nominates BP Executive Emm

Petrobras Buys Back Petronas Stake in Two Brazil Offshore Fields

Petrobras Buys Back Petronas S

OneSubsea to Supply Production Boosting System for Shenandoah Field

OneSubsea to Supply Production

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine