Technip gets Anadarko GoM subsea contract

Anadarko Petroleum Corp. awarded Technip a contract for the K2 Riser Base Gas Lift project, located in Green Canyon 608 in the Gulf of Mexico, at a water depth of approximately 1300m.

Upon the terms of agreement, Technip will provide:

  • Project management and engineering from Technip’s Houston office,
  • Design, fabrication, and installation of two PLEMs and four PLETs,
  • Installation of flowline, jumpers and associated terminations and hardware,
  • Installation of one free issued dynamic umbilical with SUTA(1) and flying leads,
  • Pre-commissioning of the flowline and umbilical gas lift system.

The offshore installation is expected to be done in 2H 2015 by Technip’s ultra deepwater pipelay and subsea construction vessel Deep Blue.

Image of the Deep Blue. From Technip.

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine