TDI-Brooks recently completed a third-party geotechnical project offshore Alaska, supporting a short cable route survey for Woolpert utilizing their Gravity CPT Stinger (gCPT) system. The project consisted of a geophysical and geotechnical survey for a marine cable route in the Valdez Arm.Designed for rapid deployment in remote and challenging environments, the gCPT tool enables efficient in-situ soil characterization without the need for conventional drilling…
For the Farasan-Madayah Submarine Cable Project, deugro China, deugro Saudi Arabia, deugro Chartering, and the engineers from dteq Transport Engineering Solutions transported almost 110 kilometers of 132 kV CTS submarine cables from China to the Port of Jazan…
Tekmar Group plc, a provider of asset protection technology and offshore energy services, announced it has been awarded a USD$1.16 million (c.€1 million) contract with a submarine cable contractor for concrete protection solutions as part of…
The North Sea Boulevard and Maasvlakte Boulevard are reopened to traffic as TenneT's cables for connecting two offshore wind farms are now buried in the seabed along the road. The high-voltage cables for the future IJmuiden Ver Beta and IJmuiden…
Whether you're in offshore wind, grid operations, geotechnical engineering, or digital transformation, this session, in conjunction with Offshore Engineer, will offer actionable insights, live demos, and expert opinions on:Why cable heat matters…
Van Oord has completed the laying, burial, termination and testing of 109 array cables at the Sofia Offshore Wind Farm. The Sofia project marked the first operational deployment of cable-laying vessel Calypso. Purpose-built to install cables for offshore wind projects worldwide…