2H Offshore wins two Stampede contracts

Published

2H Offshore has been awarded two separate contracts, one by Hess Corp. and a second contract by Enbridge Energy Co., to verify the design, fabrication and installation phases of the steel catenary risers (SCRs) for the Stampede field development in the Gulf of Mexico (GOM). 

The Stampede field is operated by Hess. Enbridge plans to build, own and operate the oil export pipeline from the Stampede tension leg platform (TLP). The subsea development is situated in Green Canyon blocks 468, 511 and 512 in the central US GOM, in water depths of approximately 3500ft.

The primary objective of 2H’s verification work is to verify the acceptability of the Stampede SCR design, fabrication methods and installation activities for both Hess and Enbridge, and ensure that there is consistent adherence to the relevant codes, standards and specifications. The project award follows 2H’s successful completion of the design, fabrication and installation verification work for the production SCRs in the Hess-operated Tubular Bells field development last year. 

2H’s Houston office will be responsible for the contract and the execution of this work.

Image: Stampede location/2H Offshore

Current News

Technip Energies Gets On Board Thailand’s First CCS Project

Technip Energies Gets On Board

Jan De Nul Wraps Up Cable Installation Job for TenneT’s DolWin Platform

Jan De Nul Wraps Up Cable Inst

Deepsea Bollsta Rig Gets New Name as Odfjell Drilling Takes Ownership

Deepsea Bollsta Rig Gets New N

Ocean Infinity Takes Delivery of Final Armada Fleet Vessel

Ocean Infinity Takes Delivery

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine