Erin spuds Oyo-9 off Nigeria

Published

Erin Energy started drilling the Oyo-9 well offshore Nigeria with the Pacific Bora sixth-generation drilling rig.

Pacific Bora. Image from Pacific Drilling.

The well is expected to take approximately 62 days to drill and complete. The tie-in of the well to the FPSO for production commencement is expected in the later part of Q4 2017. The well is expected to add an additional 6000-7000 b/d to the field’s current production.

The Oyo field is about 75km from the coast, ranging from 200-500m water depth. It is in OML 120, which Erin Energy holds 100% stake.

In June, Erin said it had expectations to double its production from Oyo, with the Oyo-9 well.

Read more:

Erin Energy to double production with Oyo

Current News

Equinor’s First Hybrid Power Complex Starts Operations

Equinor’s First Hybrid Power C

Ocean Winds Hires Seaway7 for Offshore Wind Job in Poland

Ocean Winds Hires Seaway7 for

Oman’s Block 50 Offshore Drilling to Advance After $25M Funding Raise

Oman’s Block 50 Offshore Drill

Vissim to Provide Vessel Collision Avoidance System for Qatari Offshore Field

Vissim to Provide Vessel Colli

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine