Erin spuds Oyo-9 off Nigeria

Published

Erin Energy started drilling the Oyo-9 well offshore Nigeria with the Pacific Bora sixth-generation drilling rig.

Pacific Bora. Image from Pacific Drilling.

The well is expected to take approximately 62 days to drill and complete. The tie-in of the well to the FPSO for production commencement is expected in the later part of Q4 2017. The well is expected to add an additional 6000-7000 b/d to the field’s current production.

The Oyo field is about 75km from the coast, ranging from 200-500m water depth. It is in OML 120, which Erin Energy holds 100% stake.

In June, Erin said it had expectations to double its production from Oyo, with the Oyo-9 well.

Read more:

Erin Energy to double production with Oyo

Current News

Canada’s $4B Floating LNG Scheme Secures 12-Year Export Deal

Canada’s $4B Floating LNG Sche

Iberdrola Applies Spanish Coating Tech for German Offshore Wind Farm

Iberdrola Applies Spanish Coat

DeepOcean Set for Long-Term IMR Duty with Vår Energi

DeepOcean Set for Long-Term IM

Fugro Nets Mubadala Energy’s Deepwater Gas Job in Asia

Fugro Nets Mubadala Energy’s D

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine