Erin spuds Oyo-9 off Nigeria

Published

Erin Energy started drilling the Oyo-9 well offshore Nigeria with the Pacific Bora sixth-generation drilling rig.

Pacific Bora. Image from Pacific Drilling.

The well is expected to take approximately 62 days to drill and complete. The tie-in of the well to the FPSO for production commencement is expected in the later part of Q4 2017. The well is expected to add an additional 6000-7000 b/d to the field’s current production.

The Oyo field is about 75km from the coast, ranging from 200-500m water depth. It is in OML 120, which Erin Energy holds 100% stake.

In June, Erin said it had expectations to double its production from Oyo, with the Oyo-9 well.

Read more:

Erin Energy to double production with Oyo

Current News

Eco Wave Power Wraps Up Feasibility Study for South Africa’s Wave Project

Eco Wave Power Wraps Up Feasib

OneSubsea Gets Gullfaks Subsea Compression Upgrade by Equinor

OneSubsea Gets Gullfaks Subsea

Saipem Agrees $272M Deal to Acquire Deep Value Driller Drillship

Saipem Agrees $272M Deal to Ac

New Alliance Targets Offshore Caisson Integrity Challenges

New Alliance Targets Offshore

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine