Drydocks World Completes FPSO Upgrade, Turret Mooring Project

Published

Photo: Drydocks World
Photo: Drydocks World

Drydocks World has recently completed two projects for Bluewater Energy Services B.V. and end client Hurricane Energy plc.

The projects included the refurbishment, life extension and upgrade of the FPSO Aoka Mizu vessel, and the construction of a Turret Buoy weighing over 1,000T. In addition to the complex buoy construction project, Drydocks World teams fabricated and installed over 1,000T of structural steel, 1,800 pipe spools (including Duplex), and 55km of cables on the FPSO.

The FPSO Aoka Mizu will be deployed on the Lancaster field, west of the Shetland Isles, U.K., moored in a water depth of c. 150m. The FPSO is designed to process 30,000 barrels of oil per day, with the ability to store over 600,000 barrels of crude oil.

Current News

Saipem, Subsea 7 Undergo EU Antitrust Investigation

Saipem, Subsea 7 Undergo EU An

Baltic Power Offshore Wind Farm Delivers First Electricity to Polish Grid

Baltic Power Offshore Wind Far

Eni Enlists OneSubsea for Deepwater Umbilical Supply off Indonesia

Eni Enlists OneSubsea for Deep

Petrobras Concludes Acquisition of São Tomé and Príncipe Offshore Block

Petrobras Concludes Acquisitio

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine