CNOOC brings Qinhuangdao online

Published

CNOOC Ltd. announced that its Qinhuangdao 32-6 comprehensive adjustment project has commenced production.

The Qinhuangdao 32-6 oilfield is located at the central north of Bohai Bay with an average water depth of approximately 20m. The main production facilities of Qinhuangdao 32-6 comprehensive adjustment project include four platforms and 99 producing wells. This project is fully on-stream and expected to reach its ODP designed peak production of approximately 36,000 b/d in 2015.

CNOOC is the operator and holds 75.5% working interest in Qinhuangdao 32-6 comprehensive adjustment project with partner Chevron China Energy Co. (24.5%).

Current News

Saitec Tests Nature Inclusive Design Installations at Floating Wind Platform

Saitec Tests Nature Inclusive

Van Oord, Sumitomo Sign HVDC Framework Deal for Scottish Interconnector

Van Oord, Sumitomo Sign HVDC F

Baker Hughes Lands Cheniere’s Sabine Pass LNG Expansion Work

Baker Hughes Lands Cheniere’s

Glamox Acquires UK Defense Lighting Specialist Consolite

Glamox Acquires UK Defense Lig

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine