CNOOC brings Qinhuangdao online

Published

CNOOC Ltd. announced that its Qinhuangdao 32-6 comprehensive adjustment project has commenced production.

The Qinhuangdao 32-6 oilfield is located at the central north of Bohai Bay with an average water depth of approximately 20m. The main production facilities of Qinhuangdao 32-6 comprehensive adjustment project include four platforms and 99 producing wells. This project is fully on-stream and expected to reach its ODP designed peak production of approximately 36,000 b/d in 2015.

CNOOC is the operator and holds 75.5% working interest in Qinhuangdao 32-6 comprehensive adjustment project with partner Chevron China Energy Co. (24.5%).

Current News

Equinor’s First Hybrid Power Complex Starts Operations

Equinor’s First Hybrid Power C

Ocean Winds Hires Seaway7 for Offshore Wind Job in Poland

Ocean Winds Hires Seaway7 for

Oman’s Block 50 Offshore Drilling to Advance After $25M Funding Raise

Oman’s Block 50 Offshore Drill

Vissim to Provide Vessel Collision Avoidance System for Qatari Offshore Field

Vissim to Provide Vessel Colli

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine