Troll C production shutdown

Production on the Troll C platform in the North Sea has been temporarily halted pending further investigation of corrosion found in the auxiliary system for gas treatment, Statoil announced on 15 November 2012.

During a scheduled inspection on the platform corrosion was discovered on a tank in the glycol system, which is an auxiliary system for treating gas on the platform.

A similar tank in a parallel gas treatment system is currently being checked.

Troll C production has been temporarily stopped pending the investigation results.

An expert team has been formed to determine further action and work scope.

Troll C has a daily production of around 120,000 barrels of oil and 10.5 million cubic metres of gas. The Fram licence owns 50.000 barrels of the oil and two million cubic metres of the gas.

Statoil's ownership interests:
Troll: 30,58 prosent
Fram: 45 prosent

Current News

Esgian Week 17 Report: New Contracts for the North Sea

Esgian Week 17 Report: New Con

Unique Group Celebrates 30 Years of Innovation

Unique Group Celebrates 30 Yea

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Subscribe for OE Digital E‑News

Offshore Engineer Magazine