McDermott awarded Megalodon installation

Published

Houston-based McDermott International won a contract to provide transportation and installation services to Walter Oil & Gas Corp. for the Megalodon platform in South Timbalier Block 311 in the Gulf of Mexico.

McDermott will provide all materials and equipment to transport and install the six-pile platform in 391ft of water, over an existing well site. The heavy-lift Derrick Barge 50 will perform a side-lift of the 3300ton jacket and set the 2100ton topsides. McDermott’s DB50 is dynamically positioned, premier heavy-left, deepwater lowering and pipelay vessel.

Installation is expected to commence in 4Q 2014.

McDermott recently completed the Ayatsil-B, one of Pemex’s four drilling platforms for use in the Mexican national’s Ayatsil-Tekel heavy oil field.

Read more:

Ayatsil-B platform complete

Current News

Chevron Vessel Begins Gas Survey Offshore Greece

Chevron Vessel Begins Gas Surv

ExxonMobil Greenlights $4B Kizomba Revamp with Fresh Discovery off Angola

ExxonMobil Greenlights $4B Kiz

Japan's KEPCO Joins 390MW Polish Offshore Wind Project

Japan's KEPCO Joins 390MW Poli

Türkiye Set for Offshore Seismic Surveys in Pakistan Ahead of 2027 Drilling

Türkiye Set for Offshore Seism

Subscribe for OE Digital E‑News