Allseas tops Pieter Schelte

Published

Allseas Group is to build a second single-lift platform installation and decommissioning vessel that will exceed the lifting capacity of its Pieter Schelte unit by 50%.

The new vessel will be able to remove all platform topsides in the North Sea, including those beyond the capability ofPieter Schelte, whichis currently being completed at Daewoo Shipbuilding and Marine Engineering (DSME) in Okpo, Korea.

Image: The new vessel design, compared to the Pieter Schelte.

The new vessel will be built to the same style twin-hull design as the Pieter Schelte, but it will be 160m (525ft) wide, compared to the Pieter Schelte's 124m (406ft), and able to lift up to 72,000-ton, compared to the Pieter Schelte's 48,000-ton for topsides and 25,000-ton for jackets.

Allseas says the new vessel, which is yet to be named, will cost about Euro2.5 billion and will be operational in 2020.

A spokesman for the company said the idea for the second vessel was about two years old. From its research into the decommissioning market, Allseas Group found there were about 13 platforms the Pieter Schelte would be unable to lift, including Troll, Gullfaks and Sleipner. The new vessel would fill this gap. He said the company believed the opportunity was there to make a second vessel worth investing in.

A construction yard has not yet been selected, said Allseas. The firm said it was currently working through conceptual designs.

The Pieter Schelte is due for delivery in late 2014. It already has its first contract signed. Shell UK awarded Allseas Group the contract for the removal, transportation and load-in to shore of the topsides of three of its Brent platforms, with an option to do the same with the fourth platform. The contract also includes the removal of Brent Alpha's steel jacket.

Image: the Pieter Schelte taking shape in Korea.

Removals are due to begin with Brent Delta in 2015/16, and the remaining topsides over the ensuing eight years with dates to be confirmed.

Read more about the Pieter Schelte:http://oedigital.com/component/k2/item/3050-mega-projects-on-the-horizon-for-the-pieter-schelte

Read more about the heavy lift market:http://oedigital.com/component/k2/item/3612-heavy-lifting-gets-versatile

Current News

Oxy Makes Oil Discovery at Bandit Prospect in Gulf of America

Oxy Makes Oil Discovery at Ban

Northern Lights Adds Third CO2 Carrier to Expand CCS Network

Northern Lights Adds Third CO2

European Consortium Targets Marine Noise from Offshore Wind Projects

European Consortium Targets Ma

RWE Installs First Recyclable-Blade Turbine at Danish Offshore Wind Farm

RWE Installs First Recyclable-

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine