Petrobras strikes Iguacu Mirim oil

Published

Petrobras encountered oil in well 3-SPS-101 (3-BRSA-1179-SPS), in the Carioca Discovery Evaluation Plan area, block BM-S-9, Santos Basin pre-salt. The well, also known as Iguaçu Mirim, is located 303km off the coast of the state of São Paulo, 34km south of the discovery well (1-SPS-50 - Carioca) and 9km south of the Iguaçu well (4-BRSA-709-SPS), at a water depth of 2158m.

This new discovery was confirmed through oil samples of approximately 20° API, taken via cable test from pre-salt carbonate reservoirs starting at a depth of 4850m.

The BM-S-9 consortium is operated by Petrobras (45%) in partnership with BG E&P Brasil (30%) and Repsol Sinopec Brasil (25%). The deadline for the declaration of commerciality is December 31, 2013.

Current News

BV M&O: More than Just Classification

BV M&O: More than Just Classif

Seraya Partners Considers Sale, IPO for Offshore Wind Firm Cyan Renewables

Seraya Partners Considers Sale

ScioSense Launches UFC23 Ultrasonic Flow Converter for High-Precision, Ultra-Low-Power Smart Metering

ScioSense Launches UFC23 Ultra

All Systems Go for Technip Energies' Job at Commonwealth LNG Scheme

All Systems Go for Technip Ene

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine