Quadrant starts at Phoenix South-2

Quadrant Energy has spudded the Phoenix South-2 well within the WA-435-P exploration permit in the North West Shelf of Australia.

Joint venture partner Carnarvon Petroleum said the well has been drilled down to approximately 1500m depth, and is currently setting the 508mm casing.

Once the casing has been set and cemented in place, the well will start drilling the 445mm hole.

The rig is expected to take between two to three weeks to complete the drilling of the hole down to a depth of approximately 3500m before running the 346mm intermediate casing.

No reservoir objectives are anticipated to be intersected in this hole section.

Quadrant holds 80% interest in WA-435-P, while Carnarvon has the remaining 20% stake.

Current News

Iran’s Top Security Body to Weigh In on Strait of Hormuz Closure

Iran’s Top Security Body to We

Gimi FLNG Starts Commercial Ops at BP’s GTA Project off Western Africa

Gimi FLNG Starts Commercial Op

Aibel to Provide Maintenance Services for Two Vår Energi’s Oil and Gas Fields

Aibel to Provide Maintenance S

MDL Assists Saipem to Deliver Offshore Campaigns in West Africa

MDL Assists Saipem to Deliver

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine