In the coming years, grid operator TenneT will bring wind energy from the sea to land on the Maasvlakte. To enable the landing of these electricity cables, contractor NRG started six drillings under the dunes May 26. Three more will follow after the summer. In recent days, NRG has made the necessary preparations both inside the dike and on the beach. The electric drill is making a horizontally directional drilling over a distance of approximately 200 meters towards the beach…
The Arab Shipbuilding and Repair Yard Company (ASRY) has signed a memorandum of Understanding (MoU) with AtkinsRéalis, an engineering services company with capabilities in the net zero energy sector. The signing took place earlier this April…