Offshore South America News - page 170

 

Oil price on the rise towards 2020

Mar 31, 2015

Oil prices are set to rise on average US$10/bbl annually towards 2020, with global liquids supply and demand balancing out in around two years, according to Oslo-headquartered oil and gas consulting and business intelligence firm Rystad Energy…

Petrobras announces new board member

Mar 27, 2015

Petrobras appointed Luciano Galvao Coutinho as chairman of the board after receiving Guido Mantega’s resignation on 26 March. Image of Petrobras headquarters. From OE Staff.   Coutinho…

Lloyd's expands capabilities in T&T

Mar 26, 2015

To meet the growing demands by operators for greater operational efficiency and public confidence in the integrity of offshore and onshore oil and gas structures, Lloyd’s Register Energy is increasing its structural engineering capabilities…

Wood Mackenzie: 2016 drilling activity set to recover

Mar 26, 2015

The oil and gas industry is responding to the low oil price environment with exploration budget cuts in 2015 which will average 30%, leading to suggestions that exploration activity could be significantly curtailed. However in an effort to drive value…

Wärtsilä inaugurates new Brazil assembly plant

Mar 25, 2015

Wärtsilä inaugurated its first unit at Porto do Açu in São João da Barra (RJ), Brazil. This is the first assembly plant and production unit for generator sets and azimuth thrusters in Brazil for Wärtsilä. Covering 4000sq m of floor space…

Fugro takes delivery of newbuild

Mar 24, 2015

Fugro took delivery of the Fugro Americas, a newbuild shallow draft survey vessel this month. The Fugro Americas. From Fugro.   Custom designed to Fugro’s specifications, the vessel…

Companies adapt to new price realities

Mar 24, 2015

Adapting to current cost conscious market conditions was the recurring theme of the Aker companies'* open day for investors last week (17 March). Edvard Grieg at Stord yard. Photo from Kvaerner.    It…

Imtech works on Marathon's Alba platform

Mar 23, 2015

Imtech Marine is supplying a heating, ventilation and air conditioning (HVAC) system to the 6000-tonne Alba B3 greenfield compression platform, currently under construction for Marathon E.G. Production. To be located in Equatorial Guinea…

No pay for Karoon’s Kangaroo-1

Mar 20, 2015

No hydrocarbons were intersected at Karoon Gas Australia’s Kangaroo West-1 offshore Brazil. Map from Karoon.   The exploration well, located in exploration block S-M-1165, reached its planned total depth of 3170m…

Anadarko contracts CGG for Colombia shoot

Mar 19, 2015

US-exploration firm Anadarko Petroleum has awarded French geoscience outfit CGG a contract to acquire and process a 16,314sq km 3D seismic survey offshore Colombia. The survey will be the largest marine seismic program ever acquired in…

Petrobras starts up Papa Terra TLP

Mar 16, 2015

Petrobras started production from the P-61 platform at the Papa Terra heavy oil field, offshore Brazil, the operator confirmed on 16 March. The P-61 is a tension leg wellhead platform (TLWP), the first of its kind to be installed offshore…

Petrobras starts early at Búzios

Mar 12, 2015

Petrobras began early production at the deepwater Búzios field offshore Brazil. The Dynamic Producer. From Sembcorp Marine.   Búzios is located in the Santos basin, about 200km off the coast of Rio de Janeiro…

Petrobras inks Libra AUV contract

Mar 09, 2015

Axa Engenharia Submarina Ltda. (AXA), a subsidiary of DeepOcean Group, has been awarded a contract for the provision of geo-hazard surveys on the Libra Field from Petróleo Brasileiro (Petrobras) led consortia, consisting of Shell Brasil Petróleo…

Chevron extends Skandi Salvador contract

Mar 06, 2015

Chevron Brasil extended the contract for Skandi Salvador and IRM services for the remainder of 2015. The extension is a direct continuation of the current contract.   The vessel has been operating for Chevron on the Frade oil field since delivery of the vessel in 2009…

Premier starts 2015 Falklands campaign

Mar 06, 2015

Premier Oil spudded its first 2015 Falklands drilling campaign well, 14/15-5, using the Eirik Raude semisubmersible drilling rig on the Zebedee prospect on 6 March. The well, on license PL004b, will test a total of seven stacked fan bodies…

Current News

TenneT Set to Start Beach Directional Drilling for Offshore Wind Farm Links

TenneT Set to Start Beach Dire

JDR Nets Subsea Umbilicals Deal for Australian Gas Project

JDR Nets Subsea Umbilicals Dea

Indonesia’s Mako Gas Project on Track for First Gas in 2027

Indonesia’s Mako Gas Project o

Woodside Completes Scarborough FPU Subsea Link Ahead of LNG Start-Up

Woodside Completes Scarborough

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine