Canyon Offshore wins Shell trenching contract

Published

Shell, the operator of the BC-10 field, has awarded a contract to Helix Energy Solutions Group’s robotics subsidiary, Canyon Offshore, to trench and bury over 40km of pipe in 1675m of water in the Campos basin offshore Brazil.

The work will be performed at the BC-10 field in the 4Q 2015 from the DP III M/V Grand Canyon I utilizing the T-1200 deepwater trenching system.

“Shell and Canyon have a long history of developing and utilizing pipeline burial trenching as a flow assurance enhancement tool, and we have performed numerous projects together in the past using this successful technology,” said Ian Edmondstone, president of Canyon. “This will be the deepest pipeline trenching project ever performed offshore Brazil.”

Image: T-1200/ Helix Energy

Current News

AF Offshore Secures North Sea Decom Job

AF Offshore Secures North Sea

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Island Offshore’s Hybrid OECV

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Jumbo Offshore Wraps Up Errea

Petronas Takes Operatorship of Oman’s Offshore Block 18

Petronas Takes Operatorship of

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine