Huisman Building Drilling System for CMHI

Published

Photo: Huisman Equipment BV
Photo: Huisman Equipment BV

This week, China Merchants Heavy Industries (CMHI) awarded Huisman a contract for the engineering and fabrication of a drilling system which will be integrated and installed on the moored drilling semi-submersible constructed at CMHI Haimen.

This drilling system will be used for oil and gas drilling activities in shallow to medium water depths all around Asia, particularly the South China Sea.

The contract is a result of a constructive cooperation between CMHI and Huisman during the semi’s concept design. The drilling system comprises an 1800kips static rated load Dual Multi Purpose Drilling Tower (DMPT), a single pipe setback drum,  innovative manipulator arms for pipe and tool handling, top drive, iron roughnecks, skid carts, catwalk machines, gantry and deck cranes, drillers cabins and Huisman’s fully integrated control system.

The Dual Multi Purpose Tower (DMPT) will be delivered in the second quarter of 2020 to CMHI Jiangsu Yard in China. Fabrication and final commissioning of the completed DMPT will take place at Huisman China.

Current News

Mubadala Hires SLB for Deepwater Drilling Services Offshore Indonesia

Mubadala Hires SLB for Deepwat

Cydome Rolls Out Remote Cybersecurity Tool for Offshore Wind Farms

Cydome Rolls Out Remote Cybers

BW Offshore, McDermott Unveil Blue Ammonia FPSO Concept (Video)

BW Offshore, McDermott Unveil

Jan De Nul’s Fleeming Jenkin CLV to Get Dedicated Training Simulator

Jan De Nul’s Fleeming Jenkin C

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine