Tullow spuds Zumba

Published

Tullow Oil began exploration drilling at the Zumba prospect in the Norwegian Sea, according to partner North Energy.

The Leiv Eiriksson. From Ocean Rig.

Zumba is located in production licence 591, on the Haltenbanken approximately 14km southeast of the Heidrun field, in about 281m water depth.

The primary objective of the Zumba well is the upper Jurassic sandstones.  Zumba has gross mean unrisked of about 184MMboe in the license, according to North Energy’s 1Q 2015 report.

The Leiv Eiriksson semisubmersible is drilling the well to a total depth of 3000m. Drilling is expected to be complete in 60 days.

Tullow Oil Norge is the operator with 60% interest. Partners include Lime Petroleum Norway (25%) and North Energy (15%). 

Current News

NOIA Celebrates Passage of TWIC Workforce Bill in the House of Representatives

NOIA Celebrates Passage of TWI

Golden Software Releases Newest Version of Surfer Mapping Program

Golden Software Releases Newes

Verlume, SubCtech Team Up on Subsea Power Systems

Verlume, SubCtech Team Up on S

Saudi Export Disruptions Push Oil to Four-Month Highs

Saudi Export Disruptions Push

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine