CX-15 tower installation

Published


Offshore engineering firm GMC Ltd. provides this video of the 2,500-ton CX-15 buoyant tower, touted at the world's largest, being installed at Corvina Field off Peru for BPZ Energy. The tower hull measures 69.9m with four, ring-stiffened connected cylindrical tubes including one central suction pile. Installed in October, the CX-15 supports a 1,500-ton, three-level topsides facility – designed by Audubon Engineering and GMC – and has a production capacity of 12,200 b/d and 12.8 MMcf/d of gas. BPZ Energy said it expects to drill its first well on the development within three to six weeks time.

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine