CX-15 tower installation

Published


Offshore engineering firm GMC Ltd. provides this video of the 2,500-ton CX-15 buoyant tower, touted at the world's largest, being installed at Corvina Field off Peru for BPZ Energy. The tower hull measures 69.9m with four, ring-stiffened connected cylindrical tubes including one central suction pile. Installed in October, the CX-15 supports a 1,500-ton, three-level topsides facility – designed by Audubon Engineering and GMC – and has a production capacity of 12,200 b/d and 12.8 MMcf/d of gas. BPZ Energy said it expects to drill its first well on the development within three to six weeks time.

Current News

Bureau Veritas Gives Blessing to Seatrium’s 30MW Floating Data Center

Bureau Veritas Gives Blessing

Nauticus Unveils Next-Gen Electric Manipulator for AUVs

Nauticus Unveils Next-Gen Elec

Keppel Launches $2.9B Program to Monetize Legacy Offshore Drilling Rigs

Keppel Launches $2.9B Program

Talos Energy Farms Into Mexico’s Offshore Oil Block via Repsol Deal

Talos Energy Farms Into Mexico

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine