Rosneft and partner Eni have spud the Maria-1 exploration well in the Zapadno-Chernomorskaya licence area in the Black Sea. The license is estimated to hold oil in place of over 570 million tons, Rosneft reported on 20 December. To prepare for drilling…
Frigstad Offshore reported Tuesday (28 November) that it had initiated a tender process with shipyards in Asia to price a new generation harsh environment semisubmersible drilling rig. The Frigstad D90TM AWD design has been developed over…
A well drilled 10km southwest of the producing Goliat oilfield in the Norwegian Barents Sea by Italian major Eni was dry, says the Norwegian Petroleum Directorate. Well 7122/10-1 S was targeting hydrocarbons in Middle Triassic reservoir rocks (Kobbe formation)…
Eni will begin drilling the Goliat Eye wildcat next month in the Barents Sea, after been given the go-ahead from Norway’s Petroleum Safety Authority (PSA). Scarabeo 8. Image from Saipem. Eni…
Norway’s Petroleum Safety Authority’s (PSA) investigation into Saipem’s Scarabeo 5 semisubmersible fire in the Njord field revealed several regulatory breaches that occurred in November 2016. Image of the Scarabeo 5…
Norway’s Petroleum Safety Authority (PSA) has granted Eni consent to use Scarabeo 8 at Goliat, which will drill two production wells, in the Barents Sea. One of the two wells to be drilled is for oil production, while the other is for water injection…
Image of the Saipem 10000, from Saipem. Saipem has won contracts with Eni worth US$230 million for work on the newly sanctioned Coral project off Mozambique; in addition to other work in the Mediterranean…
Eni's Boné exploration well in the Barents Sea is being plugged and abandoned after finding only water. The Boné well was drilled by the Scarabeo 8 semisubmersible drilling rig to a total depth of 3501m and encountered about 106m of gross water bearing reservoir…
Eni has started drilling on the Boné (Dazzler) exploration well 7318/12-1 in the Norwegian Barents Sea. Boné, being drilled using the Scarabeo 8 semisubmersible drilling rig is in a similar structural setting to the Johan Castberg discovery…
The Norwegian Petroleum Directorate (NPD) has granted Eni Norge a drilling permit for wellbore 7318/12-1, cf. Section 8 of the Resource Management Regulations. Well 7318/12-1 will be drilled from the Scarabeo 8 drilling facility. The…
Statoil reported a fire on the Scarabeo 5 drilling rig in the Njord field in the Norwegian Sea. Image of the Scarabeo 5, from Saipem. As of 20:30, Statoil said that there are…
Eni Norge is planning to drill a well on the Bone-Bignorna prospects in production licence 716 in the Barents Sea. Well 7318/12-11, in blocks 7318/11 and 7318/12, is about 320km north-west of Hammerfest in about 418m water depth…
The Petroleum Safety Authority Norway (PSA) has launched an investigation into a fire which broke out in an engine room on the Scarabeo 5 drilling unit on 22 November 2016. A team from the PSA traveled out to the rig, which is working on the Njord field in the Norwegian Sea…
Norway’s Petroleum Safety Authority (PSA) has granted Statoil consent to use the Scarabeo 5 semisubmersible rig for well activities on the Njord field, in the Norwegian Sea. Statoil is the operator at Njord, around 130km north of Kristiansund…
Statoil has been given approval to carrying out various well activities on the Njord field in the Norwegian Sea, about 130km north of Kristiansund. The Njord field has been developed using a semisubmersible drilling, accommodation and production facility…