FPSO Cidade de Paraty beginning production from the Lula Nordeste field

Published

Cidade de Paraty in production

FPSO Cidade de Paraty went on stream, beginning production from the Lula Nordeste field in the Santos Basin presalt play. It is about 300km off Brazil, in the northeast corner of Block BM-S-11.

The FPSO can process up to 120,000bo/d and 5MMcm/d of gas. Petrobras, operator, said the first well (7-LL-11-RJS) to be connected to the platform has the potential to produce 25,000b/d, but it will be restricted to 13,000b/d during the first month as processing and reinjection systems are commissioned. Petrobras will connect another seven production wells and six injection wells. Peak production, 120,000 b/d, is expected for 2H 2014.

Current News

Van Oord Completes Monopile Installation at Windanker

Van Oord Completes Monopile In

Australian Union Members Back Pluto LNG 2 Strike

Australian Union Members Back

Survey shows that oil companies in Norway will drill 18% less exploration wells by 2026.

Survey shows that oil companie

Cadeler’s WTIV Newbuild En Route to Europe for Maiden Offshore Wind Job

Cadeler’s WTIV Newbuild En Rou

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine