FPSO Cidade de Paraty beginning production from the Lula Nordeste field

Cidade de Paraty in production

FPSO Cidade de Paraty went on stream, beginning production from the Lula Nordeste field in the Santos Basin presalt play. It is about 300km off Brazil, in the northeast corner of Block BM-S-11.

The FPSO can process up to 120,000bo/d and 5MMcm/d of gas. Petrobras, operator, said the first well (7-LL-11-RJS) to be connected to the platform has the potential to produce 25,000b/d, but it will be restricted to 13,000b/d during the first month as processing and reinjection systems are commissioned. Petrobras will connect another seven production wells and six injection wells. Peak production, 120,000 b/d, is expected for 2H 2014.

Current News

Hornbeck Offshore Installs New DP Simulator

Hornbeck Offshore Installs New

US Opens Bidding for Offshore Wind Acreage off Texas

US Opens Bidding for Offshore

Borr Drilling Scoops $332M in Three Jack-Up Rig Contracts

Borr Drilling Scoops $332M in

Twin Brothers Marine Assists US Northeast Coast Offshore Wind Development

Twin Brothers Marine Assists U

Subscribe for OE Digital E‑News

Offshore Engineer Magazine