Hakuryu-11 heads to Indonesia

Published

Lundin petroleum began towing the Hakuryu-11 jackup rig to Indonesia, for drilling of the Balqis-1 well part of the Baronang production sharing contract (PSC).

Following drilling on the Balqis-1, the Hakuryu-11 will commence drilling on the Boni-1 well, which will be drilled as an explatory sidetrack well from the same surface location as Balqis-1.

The Balqis-1 exploration well will test the oil potential of the primary upper and lower Gabus formation sandstones in a 3D-defined structural closure.

JV partner, Nido Petroleum, also secured an extension of time within which it can elect to increase its equity in the Baronang, Cakalang, and Gurita PSCs.

In June 2013, both companies executed three separate farm-in agreements to participate in the Baronang, Cakalang, and Gurita PSCs in the Penyu and West Natuna basins, offshore Indonesia.

The Balqis prospect is estimated to hold 47MMboe of gross unrisked prospective resources.

Current News

DroneQ Robotics, Mark Offshore Collaborate with R/V Mintis

DroneQ Robotics, Mark Offshore

OMV Petrom’s Black Sea Well Fails to Find Significant Gas Volumes

OMV Petrom’s Black Sea Well Fa

Eco Wave Power Completes Los Angeles Wave Energy Pilot with Shell

Eco Wave Power Completes Los A

Borr Drilling Secures New Drilling Rig Contracts Across Four Regions

Borr Drilling Secures New Dril

Subscribe for OE Digital E‑News