Seven Arctic gets animated

Published

Subsea 7 provides this animation of its new heavy construction vessel The Seven Arctic, which is under construction at Hyundai Heavy Industries (HHI) in South Korea, and due for delivery in 2016. The newbuild subsea construction vessel comes equipped with a 325mt top tension Huisman vertical pipelay system, a 7000mt MAATS underdeck basket for storage of flexible pipe/umbilical and a newly designed 900mt Huisman rope-luffing knuckle-boom crane. Wärtsilä Ship Design Norway provided the preliminary design, while HHI will provide detailed design and construction.

Current News

Meg O’Neill to Serve as Next CEO of bp

Meg O’Neill to Serve as Next C

Petrobras Strike Extends to Offshore Oil Platforms in Campos Basin

Petrobras Strike Extends to Of

US Government Debates Reconsidering Approval of Virginia Offshore Wind Project

US Government Debates Reconsid

Canada’s $4B Floating LNG Scheme Secures 12-Year Export Deal

Canada’s $4B Floating LNG Sche

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine