Bumi Armada signs US$300 million FSU deal

Published

Malaysia-based Bumi Armada Berhad’s wholly owned subsidiaries Armada Floating Gas Storage Malta (AFG Storage) and Armada Floating Gas Services Malta (AFG Services) entered into a US$300 million deal with ElectroGas Malta (EGM) for the conversion, supply and operations and maintenance, respectively, of one floating storage unit (FSU) for the project relating to the construction and operation of an LNG receiving terminal located at Delimara, Malta.

The effective date of the contracts is 13 April 2015 for a firm period of 18 years and two months.

The FSU is expected to begin operations in Delimara in 2016.

 

Current News

BOEM Initiates Process for Potential Mineral Lease Sale Offshore Virginia

BOEM Initiates Process for Pot

Jumbo Scoops Two Offshore Wind Contracts

Jumbo Scoops Two Offshore Wind

Wood Nets Long-Term Maintenance Contract for Rio Grande LNG Facility

Wood Nets Long-Term Maintenanc

TechnipFMC to Supply Subsea Systems for Chevron’s Gas Project off Australia

TechnipFMC to Supply Subsea Sy

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine