CNOOC commences Luda 10-1 production

CNOOC Limited has announced that the Luda 10-1 comprehensive adjustment project has commenced production.

The Luda 10-1 oilfield is located in Liaodong Bay of Bohai with an average water depth of approximately 30m. In addition to fully utilizing the existing facilities of Luda 10-1, this adjustment project has also built one wellhead platform. There are currently 13 producing wells producing approximately 3300bopd. The adjustment project is expected to reach its ODP designed peak production of approximately 6000bopd in 2016.

The Luda 10-1 is an independent oilfield in which CNOOC Limited holds 100% interest and acts as the operator.

Image:Logo/CNOOC Limited

Current News

RTS Wind Lands Offshore Wind Services Deal with Ørsted

RTS Wind Lands Offshore Wind S

Philippines' PXP Energy Eyes Petroleum Blocks in Non-Disputed Areas

Philippines' PXP Energy Eyes P

Namibia's NAMCOR Signs Deal with Chevron to Develop Offshore Block

Namibia's NAMCOR Signs Deal wi

Equinor Secures Consent to Drill Two Wells in North Sea

Equinor Secures Consent to Dri

Subscribe for OE Digital E‑News

Offshore Engineer Magazine