CNOOC commences Luda 10-1 production

Published

CNOOC Limited has announced that the Luda 10-1 comprehensive adjustment project has commenced production.

The Luda 10-1 oilfield is located in Liaodong Bay of Bohai with an average water depth of approximately 30m. In addition to fully utilizing the existing facilities of Luda 10-1, this adjustment project has also built one wellhead platform. There are currently 13 producing wells producing approximately 3300bopd. The adjustment project is expected to reach its ODP designed peak production of approximately 6000bopd in 2016.

The Luda 10-1 is an independent oilfield in which CNOOC Limited holds 100% interest and acts as the operator.

Image:Logo/CNOOC Limited

Current News

ExxonMobil Taps Saipem, Jan De Nul for Rovuma LNG Work

ExxonMobil Taps Saipem, Jan De

Boskalis’ Windpiper Starts Maiden Job at Polish Wind Farms

Boskalis’ Windpiper Starts Mai

GEOS’ Energy Paradise PSV to Stay with Peterson into 2027

GEOS’ Energy Paradise PSV to S

Vår Energi Picks Odfjell Drilling’s Deepsea Bergen for Multi-Year Drilling Ops

Vår Energi Picks Odfjell Drill

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine