CNOOC commences Luda 10-1 production

CNOOC Limited has announced that the Luda 10-1 comprehensive adjustment project has commenced production.

The Luda 10-1 oilfield is located in Liaodong Bay of Bohai with an average water depth of approximately 30m. In addition to fully utilizing the existing facilities of Luda 10-1, this adjustment project has also built one wellhead platform. There are currently 13 producing wells producing approximately 3300bopd. The adjustment project is expected to reach its ODP designed peak production of approximately 6000bopd in 2016.

The Luda 10-1 is an independent oilfield in which CNOOC Limited holds 100% interest and acts as the operator.

Image:Logo/CNOOC Limited

Current News

UK Firm Seeks Suppliers to Build Full-Scale Tidal Energy Prototype

UK Firm Seeks Suppliers to Bui

Brava Energia Inks $65M Deal with PetroReconcavo for Natural Gas Assets

Brava Energia Inks $65M Deal w

Record Offshore Wind Auction Required for UK to Meet Targets

Record Offshore Wind Auction R

First French Floating Wind Farm Fully Commissioned

First French Floating Wind Far

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine