CNOOC commences Luda 10-1 production

Published

CNOOC Limited has announced that the Luda 10-1 comprehensive adjustment project has commenced production.

The Luda 10-1 oilfield is located in Liaodong Bay of Bohai with an average water depth of approximately 30m. In addition to fully utilizing the existing facilities of Luda 10-1, this adjustment project has also built one wellhead platform. There are currently 13 producing wells producing approximately 3300bopd. The adjustment project is expected to reach its ODP designed peak production of approximately 6000bopd in 2016.

The Luda 10-1 is an independent oilfield in which CNOOC Limited holds 100% interest and acts as the operator.

Image:Logo/CNOOC Limited

Current News

Shell in Talks with Venezuela for More Gas Areas

Shell in Talks with Venezuela

Teledyne eXtreamer for Seismic Data Receives 2026 Spotlight on New Technology Award

Teledyne eXtreamer for Seismic

Iran War Reshapes Global LNG Trade

Iran War Reshapes Global LNG T

US Exempts Gulf of Mexico Drillers from Endangered Species Rules

US Exempts Gulf of Mexico Dril

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine