Draugen subsea module heavy lift

Heerema Marine Contractor's Thialf heavy lift vessel lifted the new subsea pump control module (PCM) onto Shell's Draugen platform offshore Norway late last month.

The 220-tonne control module is the topside part of the subsea pump system, which is planned to be commissioned later in 2016. The pump will boost production from the Draugen subsea wells. 

Current News

Sapura Energy Hooks Subsea Services Contract from Thai Oil Major Off Malaysia

Sapura Energy Hooks Subsea Ser

RTS Wind Lands Offshore Wind Services Deal with Ørsted

RTS Wind Lands Offshore Wind S

Philippines' PXP Energy Eyes Petroleum Blocks in Non-Disputed Areas

Philippines' PXP Energy Eyes P

Namibia's NAMCOR Signs Deal with Chevron to Develop Offshore Block

Namibia's NAMCOR Signs Deal wi

Subscribe for OE Digital E‑News

Offshore Engineer Magazine