Statoil readies for Snøhvit drilling

Published

Statoil has been approved to use newbuild Cat D semisubmersible drilling rig Songa Enabler to drill three wells - two production and one CO2 reinjection - at the Snøhvit gas field in the Barents Sea.

Snøhvit started production in 2007 via a subsea development, with gas transported by pipeline 143km to shore at Melkøya, off Hammerfest.

Gas from the field contains CO2, which is separated out at Melkøya and sent back to the field for reinjection.

Drilling was due to start late July at two well templates in about 320m water depth, according to the Petroleum Safety Authority (PSA). 

Songa Enabler was delivered by the Daewoo yard in South Korea in 2016. It was the fourth and final rig in a string of newbuilds built by Songa Offshore for use by Statoil in Norway. Songa Enabler was issued with an acknowledgement of compliance by the PSA in July 2016.

Current News

AF Offshore Secures North Sea Decom Job

AF Offshore Secures North Sea

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Island Offshore’s Hybrid OECV

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Jumbo Offshore Wraps Up Errea

Petronas Takes Operatorship of Oman’s Offshore Block 18

Petronas Takes Operatorship of

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine