Ramp up at Kiliwani North

Published

Aminex has increased gas production from the Kiliwani North-1 well, offshore Tanzania.

The well, drilled on the Kwiliwani North field from Songo Songo Island island, was brought on stream in April. It reached 30 MMcf/d boe at the weekend and the commissioning process at the Songo Songo Island gas plant, from which a pipeline will carry the produced gas to the mainland, is expected to be concluded with the testing of the well due to determine optimal rates.

The field was discovered in 2008 and contains an estimated 28 Bcf contingent resources. 

Current News

Seatrium Gets Repeat Order from IMI for Arabia 4 Jack-up Rig

Seatrium Gets Repeat Order fro

Sea Lion Oil Project in Falkland Islands Gets Green Light

Sea Lion Oil Project in Falkla

ABB’s Streamlined DP2 System Passes Sea Trials on DEME’s Norse Wind WTIV

ABB’s Streamlined DP2 System P

Bourbon Inks Multi-Year PSV Deal with ExxonMobil in Guyana

Bourbon Inks Multi-Year PSV De

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine