FloaTEC Singapore Pte Ltd. mates Petrobras P-61

Published

FloaTEC mates P-61 modules

FloaTEC Singapore Pte Ltd. mated the topsides and hull of Petrobras P-61, Brazil’s first tension-leg wellhead platform (TLWP) near the BrasFELS yard in Angra dos Reis, southern Rio de Janeiro state, Brazil. The P-61 TLWP will be installed later this year at the Papa Terra heavy oil field for Papa Terra BV- a joint venture company formed by Petrobras and Chevron.

Current News

EnergyPathways Selects Jacobs as Tier-1 Engineering, Regulatory Partner

EnergyPathways Selects Jacobs

Eni Picks McDermott for Cronos Field Subsea Work off Cyprus

Eni Picks McDermott for Cronos

T12 Engineering Gets OWGP Funding for Floating Wind Mooring Tech

T12 Engineering Gets OWGP Fund

Elia Secures $1.1B EIB Loan for Princess Elisabeth Energy Island

Elia Secures $1.1B EIB Loan fo

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine