Lukoil Groundbreaking Ceremony at Rakushechnoye Field

Published

Russia's Lukoil informed its President Vagit Alekperov, jointly with Head of the Astrakhan Region Sergey Morozov, took part in the official groundbreaking ceremony to mark the start of construction of infrastructure facilities of Rakushechnoye field.

This is the Company's third large project in the Caspian Sea alongside with two other fields, Yury Korchagin and Vladimir Filanovsky.

Commercial oil production, with an estimated plateau level of 1.2 million tonnes, is expected to commence in 2023.

Proximity to the Сompany's other Caspian fields makes it possible to use already available power supply facilities and infrastructure for the treatment and shipping of the products, thus contributing to an overall optimization of the project.

The Rakushechnoye field's infrastructure includes an ice-resistant fixed offshore platform and a living-quarter platform, interconnected with a gallery bridge. All the facilities will be built by a Russian contractor at shipbuilding yards in the Astrakhan Region.

Current News

Dajin Forms Offshore Wind Alliance with German Port Terminal Operator

Dajin Forms Offshore Wind Alli

EnerMech Hires Former SLB Executive to Lead Energy Solutions Division

EnerMech Hires Former SLB Exec

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

Eni Expands Asian Footprint wi

Jasmund Substation’s Topside and Jacket Sets Sail to Baltic Sea

Jasmund Substation’s Topside a

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine