VIDEO: Culzean installation highlights

Published

Danish oil firm Maersk Oil has published a video with timelapse footage and interviews with key people, showing the main 2017 milestones in the UK North Sea Culzean development.

The Culzean field - discovered in 2008 - is in the UK central North Sea, about 250km east of Aberdeen in block 22/25a. Water depth is about 88m and the reservoir is about 4300m below sea level.

The overall Culzean development consists of a wellhead platform, a central processing facility platform and a separate utilities and living quarter platform. The platforms will be interconnected by two bridges, each approximately 100m in length. First gas is expected in 2019. The Culzean project has the potential to meet around 5% of the British gas consumption in 2020/21.

Watch some of the awesome footage from the 2017 installation campaign below. 

 

Current News

QatarEnergy Receives Offshore Exploration License From Libya

QatarEnergy Receives Offshore

Libya Awards First Oil Blocks Since 2007 to Chevron, Eni

Libya Awards First Oil Blocks

TGS Embarks on Multi-Client 2D Survey off Angola

TGS Embarks on Multi-Client 2D

Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW

Orbital Marine Grows UK and Ca

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine