Allseas bags Valhall removal work

Image of Olav Henriksen (SVP Projects, Aker BP, left) and Pieter Heerema (Projects, Allseas) at the signing ceremony in Stavanger 29 May 2017. Image from Aker BP.

Allseas, via Excalibur Marine Contractors, has been awarded a long term frame agreement for transport, installation and removal (T,I&R) services for Aker BP, for removal of the Valhall QP topsides and QP/DP bridge in 2019 and disposal thereafter. 

The deal is for six years, with options to extend the contract twice for two years each.

In addition, options have been agreed for removal and disposal of the QP and 2/4G jackets in the future.

Last month Heerema was awarded a long term T&I frame agreement and call off for Valhall Flank West (VFW) installation. The frame agreement will now be amended to include removal services and become a T,I&R frame agreement.

Current News

Strohm Reels In ExxonMobil’s Third TCP Deal Offshore Guyana

Strohm Reels In ExxonMobil’s T

Ocean Charger for Offshore Wind Vessels Proves a Success

Ocean Charger for Offshore Win

Allseas Makes Progress on Santos’ Barossa Gas Export Pipeline in Australia

Allseas Makes Progress on Sant

HSM Rolls Out Topside for ONE-Dyas’ Offshore Wind-Powered Gas Platform

HSM Rolls Out Topside for ONE-

Subscribe for OE Digital E‑News

Offshore Engineer Magazine