Subsea 7 inks Maria EPCI

Published

Subsea 7 has been award of a US$300 million pipeline and subsea contract for the Wintershall Norge Maria field development.

Maria is located in the Norwegian Sea at 300m water depth.

The contract consists of engineering, procurement, construction and installation (EPCI) of 95km of rigid flowlines and associated structures to develop the Maria field.

Project management and engineering work will commence immediately at Subsea 7's offices in Stavanger, Norway. Offshore activities will utilize a variety of Subsea 7 vessels, including the newbuild vessel, Seven Arctic, with its high-end capability and capacity.

Offshore operations are scheduled to commence in 2016 and are expected to be completed in 2017. The pipeline production for clad, mechanically lined pipe (BuBi), plastic lined and carbon steel pipelines will take place at Subsea 7's spoolbase at Vigra, Norway.

Current News

Seiche Leads Pilot Study to Assess Piling Noise Offshore

Seiche Leads Pilot Study to As

Aqua superPower, Tidal Transit Partner on Electric CTVs

Aqua superPower, Tidal Transit

Liebherr Completes Offshore Crane Overhaul on ZITON’s Jack-Up Vessel

Liebherr Completes Offshore Cr

Adura Hires Shearwater for OBN Seismic Survey Job on North Sea Field

Adura Hires Shearwater for OBN

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine