Trio to FEED Pil & Bue

Published

VNG Norge has awarded a trio of companies, Subsea 7, TechnipFMC, and Aker Solutions, front-end engineering and design (FEED) contracts for the Pil & Bue project, in the Norwegian Sea.

Subsea 7 and TechnipFMC won the subsea structures, umbilicals, risers and flowlines (SURF) portion of the deal; while the duo of TechnipFMC and Aker Solutions won the subsea production systems portion of Pil & Bue.

The FEED awards were based on a prequalification of tenderers, says VNG.

The studies will culminate in a design competition on which the contract for engineering, procurement, construction and installation (EPCI/EPC) will be awarded in Q4 2017.

Last month, VNG announced it plans to have a final investment decision for the project by the end of this year.

Pil and Bue, in PL 586, will be developed as a tie-back to the nearby Njord platform.

With total estimated resources of 90-200 MMboe. Pil is estimated to hold 7.5-14.9 MMcum of recoverable oil and condensate, and 3.7-5.9 Bcm of recoverable gas; while Bue has estimated resources of 1.5-2.6 MMcum of recoverable oil equivalent.

VNG is the operator with 30% stake. Partners include Faroe Petroleum (25%) and Point Resources (45%).

Read more:

Pil & Bue FID set for year-end

Pil & Bue to tieback to Njord A

Current News

Norway Approves Request to Delay Offshore Wind Farm License Application

Norway Approves Request to Del

TenneT Completes Drilling, Installation of Protective Conduits for Wind Farms

TenneT Completes Drilling, Ins

Alexandre de Gusmão FPSO Reaches Peak Production

Alexandre de Gusmão FPSO Reach

Transocean Awarded $300 Million Contract for Ultra-Deepwater Drillship

Transocean Awarded $300 Millio

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine