Final Cat D newbuild starts work for Statoil

Published

Songa Offshore's fourth and final newbuild Cat D Rig, the semisubmersible Songa Enabler, has started drilling operations on 29 July offshore Norway for Norwegian oil giant Statoil.

All four rigs are semisubmersible, sixth generation Cat D drilling rigs built by Daewoo Shipbuilding & Marine Engineering in Korea.

The Songa Enabler is now on operating rate under its eight-year drilling contract with Statoil. Songa Enabler is the last rig in a series of four Category D semisubmersible drilling rigs, specifically built for and contracted to Statoil.

Read more

Fourth and final Cat D delivered

Current News

BOEM Initiates Process for Potential Mineral Lease Sale Offshore Virginia

BOEM Initiates Process for Pot

Jumbo Scoops Two Offshore Wind Contracts

Jumbo Scoops Two Offshore Wind

Wood Nets Long-Term Maintenance Contract for Rio Grande LNG Facility

Wood Nets Long-Term Maintenanc

TechnipFMC to Supply Subsea Systems for Chevron’s Gas Project off Australia

TechnipFMC to Supply Subsea Sy

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine