Final Cat D newbuild starts work for Statoil

Published

Songa Offshore's fourth and final newbuild Cat D Rig, the semisubmersible Songa Enabler, has started drilling operations on 29 July offshore Norway for Norwegian oil giant Statoil.

All four rigs are semisubmersible, sixth generation Cat D drilling rigs built by Daewoo Shipbuilding & Marine Engineering in Korea.

The Songa Enabler is now on operating rate under its eight-year drilling contract with Statoil. Songa Enabler is the last rig in a series of four Category D semisubmersible drilling rigs, specifically built for and contracted to Statoil.

Read more

Fourth and final Cat D delivered

Current News

Shell to Take 30% Stake in Equinor's Bay du Nord Project off Canada

Shell to Take 30% Stake in Equ

Transocean Adds $1.1B to Offshore Drilling Backlog

Transocean Adds $1.1B to Offsh

Gennaker Offshore Substations Depart for Baltic Sea Installation (Video)

Gennaker Offshore Substations

Valeura Starts Wassana Platform Installation Offshore Thailand

Valeura Starts Wassana Platfor

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine