Shell to drill at Draugen with Island Constructor

Norway’s Petroleum Safety Authority (PSA) has given Norske Shell consent to use the Island Constructor mobile drilling facility for start-up and repair of wells on the Draugen field, offshore Norway.

Draugen is an oil field in the Norwegian Sea in 250m of water. The field has been developed using a fixed concrete facility with an integrated deck. Stabilized oil is stored in tanks in the base of the facility.

Island Constructor is a facility designed for well intervention which is operated by Island Offshore Management. The facility received Acknowledgement of Compliance (AoC) in September 2010.

In April, Island Offshore secured contracts with Norske Shell worth US$12 million (100 million NOK) for two of its vessels, the Island Valiant and Island Constructor at the Draugen oil field.

The Island Valiant will began its contract with IMR-work (inspection, maintenance and repair) on three wells in April, preparing the wells for the work, which the Island Constructor will perform later in the summer.

Image of the Island Constructor, from Island Offshore.

Read more:

Two Island vessels ink Shell work

Current News

Argentina’s 30 MMtpa LNG Ambition by 2030 – Is It feasible?

Argentina’s 30 MMtpa LNG Ambit

The Gulf of America Can Lead in Carbon Storage, If Washington Acts

The Gulf of America Can Lead i

Oceaneering Awarded Funding for Rosyth Cable Manufacturing Facility

Oceaneering Awarded Funding fo

Robosys Automation Aims to Streamline Offshore Wind Environmental Data Collection

Robosys Automation Aims to Str

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine