Offshore FPSO News - page 107


BG: Developing Knarr

Mar 24, 2015

BG Group began production at the Knarr field in the North Sea, seven years after its discovery. In this video, BG Group takes you to the process to get to this month, where its first floating vessel development is expected to deliver vital resources to the European energy market…

Aptomar gets Goliat oil spill detection gig

Mar 24, 2015

International oil spill player Aptomar entered into a service agreement with Hammerfest-based maritime electronics company O.M. Rønning Skipselektronikk to further enhance oil spill detection and combating capabilities at Eni Norge’s Goliat field…

EnQuest Producer completes sea trials

Mar 19, 2015

EnQuest’s Alma/Galia development floating production vessel the EnQuest Producer has left its berth in Newcastle, northern England, where it was undergoing finishing and commissioning works, and has completed marine trials.  The 249m-long unit…

Balmoral designs Western Isles mooring connection system

Mar 18, 2015

Dana Petroleum awarded Balmoral Offshore Engineering a contract to design and manufacture key components for a pioneering mooring system to be used on its Western Isles project in the challenging northern sector of the North Sea. Image…

BG starts-up Knarr FPSO

Mar 18, 2015

First production has started from the BG Group-operated Knarr field in the Norwegian sector of the North Sea. Knarr, discovered in 2008, with estimated gross recoverable reserves around 80 MMboe, is being produced from two subsea templates…

GE gets $850 million Ghana contract

Mar 17, 2015

GE Oil & Gas announced the booking of an US$850 million order across its oil and gas business for the supply of equipment to the Offshore Cape Three Points (OCTP) block, Ghana. The OCTP block is located in offshore Ghana at a water depth of 500-1100 meters…

Goliat’s voyage to Norway

Mar 17, 2015

In this video, Eni shows the Goliat’s voyage from Korea to the Barents Sea. Eni’s operated cyclindrical floating production, storage and offloading (FPSO) platform was built in South Korea and is now operating in the Barents Sea…

Petrobras starts up Papa Terra TLP

Mar 16, 2015

Petrobras started production from the P-61 platform at the Papa Terra heavy oil field, offshore Brazil, the operator confirmed on 16 March. The P-61 is a tension leg wellhead platform (TLWP), the first of its kind to be installed offshore…

Petrobras starts early at Búzios

Mar 12, 2015

Petrobras began early production at the deepwater Búzios field offshore Brazil. The Dynamic Producer. From Sembcorp Marine.   Búzios is located in the Santos basin, about 200km off the coast of Rio de Janeiro…

Premier’s Pelikan produces

Mar 10, 2015

Premier Oil’s Pelikan is onstream after gas production began from the field, offshore Indonesia. Map from Premier Oil.   The Pelikan field is located in the Natuna Sea Block A and has 75 Bcf of reserves…

AWE begins subsea tieback in New Zealand

Mar 09, 2015

AWE Ltd. began the Pateke-4H subsea tieback and installation project offshore New Zealand. Map from AWE.   Pateke-4H is located in the offshore Taranaki basin, in the PMP 38158 permit area…

West Africa an FPSO hot spot

Mar 09, 2015

The low oil price is having major impact across the oil and gas industry. However, DW’s recently released World Floating Production Market Forecast 2015-2019 expects capital expenditure on FPS units to total $81 billion between 2015 and 2019…

Alfa Laval picks up Angolan FPSO contracts

Mar 09, 2015

Swedish heat transfer, centrifugal separation and fluid handling firm Alfa Laval has won a US$30.7 million order to supply Framo pumping systems for floating production (FPSO) vessel projects in Angola. The order, scheduled to be delivered in 2015-16…

Lloyd’s completes safety work on Vette FPSO

Mar 06, 2015

Lloyd’s Register Consulting completed safety work packages for Aibel regarding an engineering and design contract for the Vette floating productions storage and offloading (FPSO) project. The safety contracts cover quantitative risk assessments…

Restart hits snag at Haewene Brim

Mar 06, 2015

The Haewene Brim floating production (FPSO) facliity in the UK North Sea has resumed production after being shut-in just months after starting production following an overhaul.  The Haewene Brim, which is operated by Bluewater on behalf of Shell…

Current News

Beach Energy to Let Go 30% of Workforce Amid Strategic Review

Ocean Infinity Inks Deal with Shell for Subsea Data Capture Services

EnQuest Trims Loss and Announces $15M Share Buyback

Petrofac Gets Contract Extension with ONEgas in UK

Subscribe for OE Digital E‑News