Siem Offshore Nets 7-month OSCV Deal at Equinor's Hywind Tampen Floating Wind Farm

Bartolomej TOmic
Friday, January 13, 2023

The Norwegian energy firm Equinor has awarded Siem Offshore a seven-month contract extension for the offshore subsea construction vessel Siem Barracuda.

The extension will keep the 120.8m vessel working on Equinor's Hywind Tampen project offshore Norway, where Equinor is building a floating wind farm to power its oil and gas platforms.

"The vessel has recently operated mainly within the offshore wind segment worldwide, and we are now very pleased to be a vital part of this challenging offshore floating wind project with operations in the North Sea," Siem Offshore said. Financial details were not disclosed.

The 88MW Hywind Tampen floating wind farm in the Norwegian part of the North Sea will be the most powerful wind farm of the type once fully operational.

The first power was produced from the first turbine at Hywind Tampen on November 13. The power was delivered to the Gullfaks A platform in the North Sea. The wind farm will consist of 11 turbines in total.


Categories: Vessels North Sea Industry News Activity Europe

Related Stories

Ocean Winds Hires Seaway7 for Offshore Wind Job in Poland

IWS Fleet Fills Charter Gaps, Secures New CSOV Deals Into 2028

Seatrium Launches Arbitration Against Maersk Over WTIV Contract Termination

Current News

Equinor’s First Hybrid Power Complex Starts Operations

Ocean Winds Hires Seaway7 for Offshore Wind Job in Poland

Oman’s Block 50 Offshore Drilling to Advance After $25M Funding Raise

Vissim to Provide Vessel Collision Avoidance System for Qatari Offshore Field

Subscribe for OE Digital E‑News