Energean Power FPSO Floated Out

Monday, September 23, 2019

A timelapse video from Energean shows the floating production, storage and offloading unit (FPSO) Energean Power being built over 10 months and then floated out from a COSCO shipyard in Zhoushan, China.

The FPSO, which floated out in mid-September, will head to the Sembcorp Marine Admiralty Yard in Singapore for outfitting and topsides integration work before being deployed as part of the Energean-operated Karish gas project offshore Israel. First gas is expected in the first quarter of 2021.

The $1.4 billion project is being managed by TechnipFMC.

Categories: Engineering FPSO Natural Gas Floating Production Construction

Related Stories

ONGC Hires Consortium to Deliver FEED Work for Bay of Bengal Oil Field

Allseas Makes Progress on Santos’ Barossa Gas Export Pipeline in Australia

HSM Rolls Out Topside for ONE-Dyas’ Offshore Wind-Powered Gas Platform

Current News

Equinor Upbeat About Investor Interest in US Offshore Wind Farm

GE Vernova Could Not Agree Turbines Switch on NY Wind Projects

Hess Profit Jumps on Guyana Output in Positive Sign for Exxon

Decarbonization Offshore O&G: Navigating the Path Forward

Subscribe for OE Digital E‑News