Energean Power FPSO Floated Out

Monday, September 23, 2019

A timelapse video from Energean shows the floating production, storage and offloading unit (FPSO) Energean Power being built over 10 months and then floated out from a COSCO shipyard in Zhoushan, China.

The FPSO, which floated out in mid-September, will head to the Sembcorp Marine Admiralty Yard in Singapore for outfitting and topsides integration work before being deployed as part of the Energean-operated Karish gas project offshore Israel. First gas is expected in the first quarter of 2021.

The $1.4 billion project is being managed by TechnipFMC.

Categories: Engineering FPSO Floating Production Construction Natural Gas

Related Stories

Mubadala Energy, PLN Energy Primer Team Up for Andaman Sea Gas Supply

UK North Sea Decommissioning Set for Sharp Rise Through 2034

ABS Grants AiP to Encomara for Squid System for Floating Offshore Wind Projects

Current News

U.S. Oil Production Still has Growth Potential

Dajin Forms Offshore Wind Alliance with German Port Terminal Operator

EnerMech Hires Former SLB Executive to Lead Energy Solutions Division

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

Subscribe for OE Digital E‑News