Energean Power FPSO Floated Out

Monday, September 23, 2019

A timelapse video from Energean shows the floating production, storage and offloading unit (FPSO) Energean Power being built over 10 months and then floated out from a COSCO shipyard in Zhoushan, China.

The FPSO, which floated out in mid-September, will head to the Sembcorp Marine Admiralty Yard in Singapore for outfitting and topsides integration work before being deployed as part of the Energean-operated Karish gas project offshore Israel. First gas is expected in the first quarter of 2021.

The $1.4 billion project is being managed by TechnipFMC.

Categories: Engineering FPSO Floating Production Construction Natural Gas

Related Stories

Woodside to run North West Shelf LNG Plant to 2070

Woodside to run North West Shelf LNG Plant to 2070

ADNOC Drilling Secures 15-Year Contract for Two Rigs

ADNOC Drilling Secures 15-Year Contract for Two Rigs

FPSO Alexandre de Gusmão Starts Production

FPSO Alexandre de Gusmão Starts Production

Current News

Steerprop Launches Largest Retractable Thruster

Okea Makes Oil Find in North Sea

Woodside to run North West Shelf LNG Plant to 2070

ADNOC Drilling Secures 15-Year Contract for Two Rigs

Subscribe for OE Digital E‑News

Offshore Engineer Magazine