BP Names New GoM Platform Argos

Monday, December 3, 2018

The new floating production unit currently being constructed for the Mad Dog 2 project in the deepwater Gulf of Mexico will be named Argos, U.K. oil major BP announced.

BP said the name was chosen by the project team and an employee survey and is a reference to Odysseus’ loyal dog from the ancient Greek epic The Odyssey, and a nod to the Mad Dog spar, an existing production facility operated by BP that is located about six nautical miles away from the Argos site.

The Mad Dog 2 project, which will help extend the life of the super-giant Mad Dog oil field beyond 2050, includes the Argos platform with the capacity to produce up to 140,000 gross barrels of crude oil per day through a subsea production system from up to 14 production wells and eight water injection wells.

The platform will be BP’s fifth operated platform in the Gulf of Mexico and the first new BP-operated production facility in the Gulf of Mexico since 2008, when Thunder Horse came online.

Starlee Sykes, BP’s regional president for the Gulf of Mexico and Canada, said, “[The Mad Dog 2 project] is key to delivering high-margin production from one of the largest fields in the Gulf of Mexico, and it will strengthen our position in the basin for years to come.”

The Argos platform hull and topsides are currently under construction in South Korea, with oil production from the facility expected to begin in late 2021. Sykes said the project is on track and on budget

Originally estimated to cost over $20 billion, BP worked with co-owners and contractors to simplify and standardize the platform’s design, reducing the overall project cost by about 60 percent. The final investment decision for the $9 billion project was approved in early 2017 by BP (60.5 percent) and co-owners BHP (23.9 percent) and Union Oil Company of California, an affiliate of Chevron U.S.A. Inc. (15.6 percent).


(Photo: BP)


(Photo: BP)

Categories: Deepwater Engineering Production Floating Production North America Construction

Related Stories

Iranian Tanker Hit by Missiles, Oil Rises

Chestnut Field Extended Up to Three Years

Bourbon Rhode Search Continues

LLOG Orders 20k Trees for Shenandoah

Eni Won't Drill Off Cyprus if Warships Sent In

OSV Owners Waiting for Better Days in Brazil

MODEC, Yinson Win FPSO Charters from Petrobras

Automated Well Control System Tested

Finding New P&A Alternatives

Keppel Delivers Jackup to Borr Drilling

Current News

Schlumberger Profit Beats Estimates

Petrobras Posts Another Major Production Boost

Eni CEO: No Future for Firms Working in Just O&G

TechnipFMC Wins EPCI Contract from Woodside

Partners Plan Floating Wind Farm in South Korea

Maersk Drilling Scores POSCO Contract

Woodside Makes FID for Pyxis Hub Project

Online Tool Helps Assess Drilling Safety

Transocean Bags $75Mln New Contracts

Naval Energies, SIDS DOCK to Support OTEC

Magazine

Offshore Engineer (Sep/Oct 2019)

This issue of Offshore Engineer is dedicated to Big Data and Digitalization

Archive
Subscribe

Subscribe for OE Digital E‑News

OE Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week