Filanovsky topsides work starts

OE Staff
Monday, December 30, 2013

Astrakhan’s Krasnye Barrikady shipyard has started constructing the living quarter platform (LQP-2) for the second stage of Vladimir Filanovsky field developed by LUKOIL in the Russian sector of the Caspian Sea.

The shipyard will construct two bearing blocks, the topside of the LQP and a catwalk bridge to connect the LQP-2 and the ice-resistant platform (IRP-2).

The LQP-2 will accommodate 55 people and include a helicopter pad.The LQP-2 is to be commissioned in the autumn of 2016.

Categories: Engineering Russia Arctic Construction Fabrication

Related Stories

Petrobras Hires SLB for Buzios Field Work Offshore Brazil

COWI to Design Foundations for GW-Scale Irish Offshore Wind Project

Miko Marine Gets MODEC’s Errea Wittu FPSO Job

Current News

Trident Energy to Restart Drilling Campaign Off Equatorial Guinea with Noble Venturer Drillship

Navigation and Wind Farms: Competing Ocean Uses Raise Existential Questions

PXGEO Acquires Modus Subsea Services

Vestas and Maersk to Build Offshore Wind Logistics Base in South Korea

Subscribe for OE Digital E‑News