Filanovsky topsides work starts

OE Staff
Monday, December 30, 2013

Astrakhan’s Krasnye Barrikady shipyard has started constructing the living quarter platform (LQP-2) for the second stage of Vladimir Filanovsky field developed by LUKOIL in the Russian sector of the Caspian Sea.

The shipyard will construct two bearing blocks, the topside of the LQP and a catwalk bridge to connect the LQP-2 and the ice-resistant platform (IRP-2).

The LQP-2 will accommodate 55 people and include a helicopter pad.The LQP-2 is to be commissioned in the autumn of 2016.

Categories: Construction Fabrication Arctic Engineering Russia

Related Stories

McDermott Reduces Carbon Intensity

McDermott Reduces Carbon Intensity

Okea Makes Oil Find in North Sea

Okea Makes Oil Find in North Sea

Woodside to run North West Shelf LNG Plant to 2070

Woodside to run North West Shelf LNG Plant to 2070

Current News

McDermott Reduces Carbon Intensity

TenneT Begins Drilling Under Dunes for Laying Electricity Cables on Maasvlakte

Japan Energy Summit & Exhibition Announced in Collaboration With LNG Producer Consumer Conference 2025

Three Dead in Chevron's Angolan Oil Patform Fire

Subscribe for OE Digital E‑News

Offshore Engineer Magazine