Filanovsky topsides work starts

OE Staff
Monday, December 30, 2013

Astrakhan’s Krasnye Barrikady shipyard has started constructing the living quarter platform (LQP-2) for the second stage of Vladimir Filanovsky field developed by LUKOIL in the Russian sector of the Caspian Sea.

The shipyard will construct two bearing blocks, the topside of the LQP and a catwalk bridge to connect the LQP-2 and the ice-resistant platform (IRP-2).

The LQP-2 will accommodate 55 people and include a helicopter pad.The LQP-2 is to be commissioned in the autumn of 2016.

Categories: Construction Fabrication Arctic Engineering Russia

Related Stories

ExxonMobil Greenlights $4B Kizomba Revamp with Fresh Discovery off Angola

Japan's KEPCO Joins 390MW Polish Offshore Wind Project

Aker Solutions Lines Up Recycling Job for Equinor’s North Sea Platform

Current News

Chevron Vessel Begins Gas Survey Offshore Greece

ExxonMobil Greenlights $4B Kizomba Revamp with Fresh Discovery off Angola

Japan's KEPCO Joins 390MW Polish Offshore Wind Project

Türkiye Set for Offshore Seismic Surveys in Pakistan Ahead of 2027 Drilling

Subscribe for OE Digital E‑News