Filanovsky topsides work starts

OE Staff
Monday, December 30, 2013

Astrakhan’s Krasnye Barrikady shipyard has started constructing the living quarter platform (LQP-2) for the second stage of Vladimir Filanovsky field developed by LUKOIL in the Russian sector of the Caspian Sea.

The shipyard will construct two bearing blocks, the topside of the LQP and a catwalk bridge to connect the LQP-2 and the ice-resistant platform (IRP-2).

The LQP-2 will accommodate 55 people and include a helicopter pad.The LQP-2 is to be commissioned in the autumn of 2016.

Categories: Construction Fabrication Arctic Engineering Russia

Related Stories

Libya Awards First Oil Blocks Since 2007 to Chevron, Eni

Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW

Precision Shaft Alignment: A Sustainable Advantage in Modern Engineering

Current News

QatarEnergy Receives Offshore Exploration License From Libya

Libya Awards First Oil Blocks Since 2007 to Chevron, Eni

TGS Embarks on Multi-Client 2D Survey off Angola

Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW

Subscribe for OE Digital E‑News