DONG Hejre jacket installation

OE Staff
Tuesday, July 22, 2014

DONG Energy released a video showing the installation of the Hejre jacket that occurred on 23 May 2014.

DONG Energy has installed the jacket for the Hejre platform in the Danish sector of the North Sea, 292km north west of Esbjerg, using Heerema Marine Contractor's Hermod heavy lift vessel

The 8400-tonne jacket arrived at its location, in 68m water depth, in the Danish sector of the North Sea on 22 May, and the last steel pile for fastening the legs of the support structure were rammed into the subsoil on Friday 30 May. Production well drilling is now due to start. First oil and gas is scheduled for 2016. 

Hejre is estimated to contain about 170MM boe. The reservoir is 5000-600m deep, at 1010 bar and 160°C.

Read more:

Hejre jacket installed

Hejre jacket sets sail

 

Categories: Installation Fabrication Europe North Sea

Related Stories

Türkiye Set for Offshore Seismic Surveys in Pakistan Ahead of 2027 Drilling

Aker Solutions Lines Up Recycling Job for Equinor’s North Sea Platform

Harbour Energy Hires Elemental Energies for Viking CCS Expansion in North Sea

Current News

Chevron Vessel Begins Gas Survey Offshore Greece

ExxonMobil Greenlights $4B Kizomba Revamp with Fresh Discovery off Angola

Japan's KEPCO Joins 390MW Polish Offshore Wind Project

Türkiye Set for Offshore Seismic Surveys in Pakistan Ahead of 2027 Drilling

Subscribe for OE Digital E‑News