Draugen subsea module heavy lift

OE Staff
Monday, June 6, 2016

Heerema Marine Contractor's Thialf heavy lift vessel lifted the new subsea pump control module (PCM) onto Shell's Draugen platform offshore Norway late last month.

The 220-tonne control module is the topside part of the subsea pump system, which is planned to be commissioned later in 2016. The pump will boost production from the Draugen subsea wells. 

Categories: Subsea North Sea

Related Stories

Balmoral Comtec Gets Hornsea 3 Cable Protection Job

Oceaneering Signs On for Terradepth's Ocean Data Service

Fugro Gets Dogger Bank South Offshore Wind Survey Job

Current News

Sapura Energy Lands $1.8B Petrobras Deal for Six Pipelaying Vessels and Subsea Services

Saudi Aramco Profit Falls Amid Lower Oil Prices and Volumes Sold

TGS Launches Multi-Client Wind and Metocean Surveys Off Germany

Escalated Middle East Conflict Could Hike Oil Price to $150/barrel, Bloomberg Finds

Subscribe for OE Digital E‑News